BLD-Conference | 7/13/2020 | 7/27/2020 | 7/27/2020 | A | DONE |
Tell Riley
|
|
|
follow up on permits //BLD is in issued status//will keep MIS open for trades//
|
MEC-Conference | 7/7/2020 | 7/21/2020 | 7/21/2020 | A | DONE |
Brian Scoles
|
|
|
check on bld and mech permit to see if issued- NO permit issued for mechanical work- BLD under review
|
BLD-Conference | 6/29/2020 | 7/13/2020 | 7/13/2020 | A | DONE |
Tell Riley
|
|
|
follow up on permits.....//permit is under review for the remodel//setup follow up in ten days to see if permit is in issued status//
|
MEC-Conference | 6/29/2020 | 7/6/2020 | 7/7/2020 | A | FAIL |
Brian Scoles
|
|
|
check for mech permit- no mech permit issued- bld not issued will check back 2 weeks
|
PLM-Conference | 6/29/2020 | 6/29/2020 | 6/29/2020 | P | DONE |
Matt Wrobel
|
|
|
plumbing in master bath, new shower, new water heater, no permits left correction notice
|
MEC-Conference | 6/29/2020 | 6/29/2020 | 6/29/2020 | P | DONE |
Brian Scoles
|
|
|
possible mechanical, no permits- will pull permit for mechanical work on range hood- rest of house has existing ducting
|
BLD-Conference | 6/26/2020 | 6/29/2020 | 6/29/2020 | A | DONE |
Tell Riley
|
|
|
Per Matt Wrobel, Possible work without permits on house on corner lot. Phone #: ###-####//CN issued to obtain necessary permits for remodel of home//follow up in 10 days//
|