INSP-Final | 1/2/2019 | 1/3/2019 | 1/2/2019 | A | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
|
INSP-Final | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | DONE |
Troy Cobbley
|
|
|
Permit finaled
RICK FRY IS OUR CONTACT Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
DOC - Permit Finaled | | | 1/2/2019 | | DONE |
|
|
|
doc final pemrit per Troy Cobbley
|
INSP-Final | 12/26/2018 | 12/27/2018 | 12/27/2018 | A | CANC |
Troy Cobbley
|
|
|
To be rescheduled when the project related fire alarm permit has been scheduled per my conversation with Rick.
Cordinate inpsection with Rick Fry Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in/Hydro | 12/19/2018 | 12/19/2018 | 12/19/2018 | P | PASS |
Troy Cobbley
|
|
|
The overhead hydro test was witnessed with no visible loss on the guage.
|
INSP-Sprinkler Rough-in | 11/8/2018 | 11/8/2018 | 11/8/2018 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed.
|
INSP-Sprinkler Rough-in/Hydro | 11/8/2018 | 11/8/2018 | 11/8/2018 | P | CANC |
Troy Cobbley
|
|
|
Please call Troy with time frame. Phone #: ###-#### >> Inspection requested via web by Jeff Packham Inspection cancelled from web by: Jeff Packham
|
INSP-Sprinkler Rough-in | 5/17/2018 | 5/18/2018 | 5/18/2018 | A | PASS |
Troy Cobbley
|
|
|
Todays inspection was to verify hanger attachments to the purlins
Contact Rick for coordination Phone #: ###-#### Inspection requested via web by Christophe Wilson
|