Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberNAF18-00057
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 112 E 38TH ST
Project Name38TH STREET WAREHOUSE
Customer Number 
ePlanReviewNo
Description
[38th Street Warehouse]
The fire sprinkler scope of work consists of 8” underground to an 8” backflow preventer to an 8” riser to a 6”x4”x2” Grid.

• The underground piping is under permit NAF18-00050

Location on Plan - Warehouse
Commodity - Unknown – Spec Warehouse
Classification - IV
Storage Type (rack, solid pile, etc.) - Rack – Single and Double Row
Pallet Type (wood or plastic) - Wood
Aisle Width - 4’
Height of Storage - 17’
Ceiling Height - 18’-6” at Hip
Encapsulated - No
Solid Shelves - No
Smoke and Heat Vents - No
Draft Curtain - No
In Rack Sprinklers - Allowance ONLY
Sprinkler Type - CMD K-16.8
High Temperature Sprinklers Required - Yes
Applicable NFPA Section - Fig, 16.1.1.3.2(d) Curve G, 16.2.1.3.4.1
Hydraulic Design Criterion - .58/2000, .58*75%=.435/2000
Hose Stream Requirements - 500

[NAF17-00077]
Garden City project (BLDFY2018-0023) - Permit for the construction of a new 15,787 sq.ft. warehouse with site improvements. This building will be fully fire sprinklered with a fire alarm system. Separate fire protection permits will be required; as regulated by North Ada County Fire Protection District.

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final1/2/20191/3/20191/2/2019ACANC
DetailsTroy Cobbley
Duplicate inspection
INSP-Final1/2/20191/2/20191/2/2019PDONE
DetailsTroy Cobbley
Permit finaled

RICK FRY IS OUR CONTACT Phone #: ###-#### Inspection requested via web by Brad Bettencourt
DOC - Permit Finaled  1/2/2019 DONE
doc final pemrit per Troy Cobbley
INSP-Final12/26/201812/27/201812/27/2018ACANC
DetailsTroy Cobbley
To be rescheduled when the project related fire alarm permit has been scheduled per my conversation with Rick.

Cordinate inpsection with Rick Fry Phone #: ###-#### Inspection requested via web by Christophe Wilson
INSP-Sprinkler Rough-in/Hydro12/19/201812/19/201812/19/2018PPASS
DetailsTroy Cobbley
The overhead hydro test was witnessed with no visible loss on the guage.
INSP-Sprinkler Rough-in11/8/201811/8/201811/8/2018PPASS
DetailsTroy Cobbley
Rough-in passed.
INSP-Sprinkler Rough-in/Hydro11/8/201811/8/201811/8/2018PCANC
DetailsTroy Cobbley
Please call Troy with time frame. Phone #: ###-#### >> Inspection requested via web by Jeff Packham Inspection cancelled from web by: Jeff Packham
INSP-Sprinkler Rough-in5/17/20185/18/20185/18/2018APASS
DetailsTroy Cobbley
Todays inspection was to verify hanger attachments to the purlins

Contact Rick for coordination Phone #: ###-#### Inspection requested via web by Christophe Wilson