Permit Information
Permit NumberPLM19-01784
StatusFinaled
Name PARK CENTER PLUMBING
Site Address 2909 W ELDER ST
Project Name 
Customer Number 
ePlanReviewNo
Description
New: 67 unit hotel , tol tub lav and ks in each room, public rest room, commercial laundry 2 washers and 2 dryers, mechanical room
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final3/25/20203/26/20203/26/2020PPASS
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by Raul Castanon
Final3/23/20203/24/20203/24/2020PPART
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by Raul Castanon-Need to install a rpba on both soap dispensers in laundry room & need trap primers in public baths.
Final3/17/20203/17/20203/17/2020APART
DetailsEric Strole
2nd, 3rd,4th floors final and mechanical room.
Call me when you will be there and i will get you a master key to the rooms for inspection Phone #: ###-#### Inspection requested via web by Raul Castanon-2nd, 3rd, 4th floor pass.
Pressure Test2/27/20202/27/20202/27/2020PPASS
DetailsEric Strole
60 lb gas test pass.
Pressure Test2/26/20202/27/20202/27/2020AFAIL
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by Raul Castanon-60 lb gas test fail.
Plumbing Rough-in2/18/20202/19/20202/19/2020PPART
DetailsEric Strole
Inspection for 1st flr corridor- Phone #: ###-#### Inspection requested via web by Raul Castanon-Hangers 1st flr hangers pass & insulation 1st flr recirc lines pass.
Plumbing Rough-in2/18/20202/18/20202/18/2020PPART
DetailsEric Strole
Inspection for Mechanical room, main hot water lines at 2nd floor, hanger for pex manifolds and at first floor Phone #: ###-#### Inspection requested via web by Raul Castanon-Ok to cover 1st floor rooms & 2nd floor corridor.
Plumbing Rough-in2/7/20202/7/20202/7/2020PPART
DetailsEric Strole
All clean outs exposed first floor Phone #: ###-#### Inspection requested via web by Raul Castanon-Ok to cover walls where base of stack clean outs where added.
Other1/27/20201/27/20201/27/2020PDONE
DetailsEric Strole
consultation regarding clean outs behind tubs, we havw a wall opened up to review what is thew best way to do this.

Please call me what time you will be there Phone #: ###-#### Inspection requested via web by Raul Castanon-Conferance on c/o locations.
Other1/23/20201/23/20201/23/2020APEND
DetailsEric Strole
Waiting to here back from engineer.
Pressure Test1/23/20201/23/20201/23/2020AFAIL
DetailsEric Strole
60 lb gas test fail, Need to pipe gas piping up to where regulators are going to be at washers and dryers.
Other1/22/20201/22/20201/23/2020APEND
DetailsEric Strole
Conferance-Waiting on more information.
Pressure Test1/21/20201/22/20201/23/2020ACANC
DetailsEric Strole
gas line 2lb system Phone #: ###-#### Inspection requested via web by Raul Castanon
Other1/21/20201/22/20201/22/2020APASS
DetailsDan Ediger
Conferance to be continued
Other1/17/20201/21/20201/21/2020ACANC
DetailsEric Strole
Conferance-Changed to tomorrow.
Other1/17/20201/21/20201/21/2020APEND
DetailsDan Ediger
Conferance
Plumbing Rough-in1/16/20201/17/20201/17/2020PFAIL
DetailsEric Strole
water test Phone #: ###-#### Inspection requested via web by Raul Castanon-Water on all floors covered without any inspections. Test fail. Need to support pex per the 2017 ISPC.
Pressure Test1/16/20201/17/20201/17/2020PFAIL
DetailsEric Strole
2lb system Phone #: ###-#### Inspection requested via web by Raul Castanon-Cannot use a 200 lb gauge. Gas covered up without any inspections.
Plumbing Rough-in1/15/20201/17/20201/16/2020ACANC
DetailsEric Strole
water pressure test Phone #: ###-#### >> Inspection requested via web by Raul Castanon Inspection cancelled from web by: Raul Castanon
Pressure Test1/15/20201/17/20201/16/2020ACANC
DetailsEric Strole
Gas line 2lb system Phone #: ###-#### >> Inspection requested via web by Raul Castanon Inspection cancelled from web by: Raul Castanon
Plumbing Rough-in10/1/201910/1/201910/1/2019PPART
DetailsDaryl Spivey
west side 1st to 4th DWV Phone #: ###-#### Inspection requested via web by Raul Castanon
Plumbing Rough-in9/26/20199/26/20199/26/2019PPART
DetailsDaryl Spivey
DWV Phone #: ###-#### Inspection requested via web by Raul Castanon
waste tested east of elevators 4 floors ok........ds
Water and/or Sewer5/8/20195/8/20195/8/2019PPASS
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by Raul Castanon-Waterline pass.
Groundwork5/3/20195/3/20195/3/2019PPASS
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by Raul Castanon