Final | 3/25/2020 | 3/26/2020 | 3/26/2020 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon
|
Final | 3/23/2020 | 3/24/2020 | 3/24/2020 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon-Need to install a rpba on both soap dispensers in laundry room & need trap primers in public baths.
|
Final | 3/17/2020 | 3/17/2020 | 3/17/2020 | A | PART |
Eric Strole
|
|
|
2nd, 3rd,4th floors final and mechanical room. Call me when you will be there and i will get you a master key to the rooms for inspection Phone #: ###-#### Inspection requested via web by Raul Castanon-2nd, 3rd, 4th floor pass.
|
Pressure Test | 2/27/2020 | 2/27/2020 | 2/27/2020 | P | PASS |
Eric Strole
|
|
|
60 lb gas test pass.
|
Pressure Test | 2/26/2020 | 2/27/2020 | 2/27/2020 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon-60 lb gas test fail.
|
Plumbing Rough-in | 2/18/2020 | 2/19/2020 | 2/19/2020 | P | PART |
Eric Strole
|
|
|
Inspection for 1st flr corridor- Phone #: ###-#### Inspection requested via web by Raul Castanon-Hangers 1st flr hangers pass & insulation 1st flr recirc lines pass.
|
Plumbing Rough-in | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | PART |
Eric Strole
|
|
|
Inspection for Mechanical room, main hot water lines at 2nd floor, hanger for pex manifolds and at first floor Phone #: ###-#### Inspection requested via web by Raul Castanon-Ok to cover 1st floor rooms & 2nd floor corridor.
|
Plumbing Rough-in | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | PART |
Eric Strole
|
|
|
All clean outs exposed first floor Phone #: ###-#### Inspection requested via web by Raul Castanon-Ok to cover walls where base of stack clean outs where added.
|
Other | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | DONE |
Eric Strole
|
|
|
consultation regarding clean outs behind tubs, we havw a wall opened up to review what is thew best way to do this.
Please call me what time you will be there Phone #: ###-#### Inspection requested via web by Raul Castanon-Conferance on c/o locations.
|
Other | 1/23/2020 | 1/23/2020 | 1/23/2020 | A | PEND |
Eric Strole
|
|
|
Waiting to here back from engineer.
|
Pressure Test | 1/23/2020 | 1/23/2020 | 1/23/2020 | A | FAIL |
Eric Strole
|
|
|
60 lb gas test fail, Need to pipe gas piping up to where regulators are going to be at washers and dryers.
|
Other | 1/22/2020 | 1/22/2020 | 1/23/2020 | A | PEND |
Eric Strole
|
|
|
Conferance-Waiting on more information.
|
Pressure Test | 1/21/2020 | 1/22/2020 | 1/23/2020 | A | CANC |
Eric Strole
|
|
|
gas line 2lb system Phone #: ###-#### Inspection requested via web by Raul Castanon
|
Other | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | PASS |
Dan Ediger
|
|
|
Conferance to be continued
|
Other | 1/17/2020 | 1/21/2020 | 1/21/2020 | A | CANC |
Eric Strole
|
|
|
Conferance-Changed to tomorrow.
|
Other | 1/17/2020 | 1/21/2020 | 1/21/2020 | A | PEND |
Dan Ediger
|
|
|
Conferance
|
Plumbing Rough-in | 1/16/2020 | 1/17/2020 | 1/17/2020 | P | FAIL |
Eric Strole
|
|
|
water test Phone #: ###-#### Inspection requested via web by Raul Castanon-Water on all floors covered without any inspections. Test fail. Need to support pex per the 2017 ISPC.
|
Pressure Test | 1/16/2020 | 1/17/2020 | 1/17/2020 | P | FAIL |
Eric Strole
|
|
|
2lb system Phone #: ###-#### Inspection requested via web by Raul Castanon-Cannot use a 200 lb gauge. Gas covered up without any inspections.
|
Plumbing Rough-in | 1/15/2020 | 1/17/2020 | 1/16/2020 | A | CANC |
Eric Strole
|
|
|
water pressure test Phone #: ###-#### >> Inspection requested via web by Raul Castanon Inspection cancelled from web by: Raul Castanon
|
Pressure Test | 1/15/2020 | 1/17/2020 | 1/16/2020 | A | CANC |
Eric Strole
|
|
|
Gas line 2lb system Phone #: ###-#### >> Inspection requested via web by Raul Castanon Inspection cancelled from web by: Raul Castanon
|
Plumbing Rough-in | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | PART |
Daryl Spivey
|
|
|
west side 1st to 4th DWV Phone #: ###-#### Inspection requested via web by Raul Castanon
|
Plumbing Rough-in | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | PART |
Daryl Spivey
|
|
|
DWV Phone #: ###-#### Inspection requested via web by Raul Castanon waste tested east of elevators 4 floors ok........ds
|
Water and/or Sewer | 5/8/2019 | 5/8/2019 | 5/8/2019 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon-Waterline pass.
|
Groundwork | 5/3/2019 | 5/3/2019 | 5/3/2019 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon
|