Information based on query as of Wednesday, May 1, 2024.
Permit Information
Permit NumberPLM19-05384
StatusFinaled
Name PAIGE MECHANICAL GROUP INC
Site Address 800 E PARK BLVD Unit: 400
Project Name 
Customer Number19.7762.22
ePlanReviewNo
Description
Alteration: DWV, Domestic Water, Fixtures, Trim
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final4/9/20204/13/20204/13/2020PPASS
DetailsDaryl Spivey
Please call Jimmy 30 min prior to arrival for access Phone #: ###-#### Inspection requested via web by Nicholas Paige
Final4/8/20204/9/20204/9/2020APART
DetailsDaryl Spivey
please call Jimmy 30 min prior to arrival for access.

thanks,
Phone #: ###-#### Inspection requested via web by Nicholas Paige
need to test b/f's and repipe T&P. cannot use flex connector nand run seperate from pan drain...........ds
Plumbing Rough-in4/8/20204/8/20204/8/2020PPASS
DetailsDaryl Spivey
Plumbing Rough-in2/5/20202/6/20202/6/2020APART
DetailsMatt Wrobel
please call Jake 30 min prior so he can meet you onsite


thank you Phone #: ###-#### Inspection requested via web by Nicholas Paige
this completes the water rough
Plumbing Rough-in1/28/20201/29/20201/29/2020APART
DetailsDaryl Spivey
please contact Jake prior to arrival for access Phone #: ###-#### Inspection requested via web by Nicholas Paige
water in restrooms and waste and vent on brk room ok.........still have some water to do..........ds
Plumbing Rough-in1/10/20201/13/20201/13/2020APART
DetailsDaryl Spivey
please call jake for access and work location prior to arriving. thanks,
Phone #: ###-#### Inspection requested via web by Nicholas Paige
ok in walls to cover...4th floor....ds
Other12/17/201912/18/201912/18/2019APART
DetailsDan Ediger
Please call Jake Prior to arriving so he can be found onsite. ###-####


this is a conference inspection Phone #: ###-#### Inspection requested via web by Nicholas Paige
1. Page P2.1B shows 2" vents running horizontal more than 40 feet. Change to 2-1/2 or 3".
2. The existing drinking fountain was plumbed without a vent. Repipe to include a vent.
3. The men's rr urinals are wet vented on-top of the woman's wc's. Change carriers to 3' or re-pipe off the carriers.
Other12/17/201912/17/201912/17/2019PNR
DetailsDan Ediger
This is a conference inspection to go over some job specific questions.

Phone #: ###-#### Inspection requested via web by Nicholas Paige
Plumbers not on site 2pm