Information based on query as of Sunday, May 5, 2024.
Permit Information
Permit NumberPLM20-00898
StatusIssued
Name DAVIES MELISSA
Site Address 2714 S CANONERO WAY
Project NameDavies Residence
Customer Number 
ePlanReviewNo
Description
Complete installation and outside sewer and water line
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plumbing Rough-in7/6/20207/6/20207/6/2020PPASS
DetailsMatt Wrobel
If there is time available after 3:30 to meet that would be great, thank you! Phone #: ###-#### Inspection requested via web by Melissa Davies
Other6/23/20206/23/20206/23/2020PDONE
DetailsMatt Wrobel
I would like to request a rough-in plumbing consultation for this afternoon to go over changes that have been made and questions I have. I have been working with the inspector Dan and would like to see him again if possible. Thank you. Phone #: ###-#### Inspection requested via web by Melissa Davies
Plumbing Rough-in6/5/20206/5/20206/5/2020PFAIL
DetailsDan Ediger
Carl Phone #: ###-####
1. Verify all overhead drain grade.
2. Use sanitary tees on all trap arms.
3. Upstairs wc is wet vented with the shower.
4. US bath lav is not vented.
5. Vent kitchen sink.
6. Install base of stack cleanout at the garage riser.
Did not crawl the crawlspace. Walked home with the homeowner to explain.
Other5/4/20205/4/20205/4/2020PDONE
DetailsMatt Wrobel
Call ahead Conference before Final - Melissa Phone #: ###-####
consult
Other4/30/20204/30/20204/30/2020PCANC
DetailsMatt Wrobel
husband call to cancel*screened* conference - Melissa Phone #: ###-####
Water and/or Sewer3/4/20203/5/20203/5/2020PPASS
DetailsMatt Wrobel
I am requesting an inspection for the water and sewer line connection, so I can fill in the trenches. I was hoping you could come out around 12:00 if possible. I will have the sewer and water line service connection complete and would like to have it inspected. I will have the installation finished by 12:00 and that would enable me to get the trenches filled in as soon as possible, because I’m trying to prep for the concrete flatwork that is scheduled for tomorrow. I took a day off work and rented a compactor so it would be really great if the 12:00 time would work out so I have time to finish the service connection in the morning and then you inspect it and then I have time to cover it and get the driveway prepped for concrete tomorrow. I appreciate it. If it’s not too much trouble, I would appreciate a call if 12:00 won’t work for you, Thank you. Phone #: ###-#### Inspection requested via web by Melissa Davies
DOC - Permit Finaled3/5/20203/5/20203/5/2020PPASS
DetailsMatt Wrobel