Plumbing Rough-in | 7/6/2020 | 7/6/2020 | 7/6/2020 | P | PASS |
Matt Wrobel
|
|
|
If there is time available after 3:30 to meet that would be great, thank you! Phone #: ###-#### Inspection requested via web by Melissa Davies
|
Other | 6/23/2020 | 6/23/2020 | 6/23/2020 | P | DONE |
Matt Wrobel
|
|
|
I would like to request a rough-in plumbing consultation for this afternoon to go over changes that have been made and questions I have. I have been working with the inspector Dan and would like to see him again if possible. Thank you. Phone #: ###-#### Inspection requested via web by Melissa Davies
|
Plumbing Rough-in | 6/5/2020 | 6/5/2020 | 6/5/2020 | P | FAIL |
Dan Ediger
|
|
|
Carl Phone #: ###-#### 1. Verify all overhead drain grade. 2. Use sanitary tees on all trap arms. 3. Upstairs wc is wet vented with the shower. 4. US bath lav is not vented. 5. Vent kitchen sink. 6. Install base of stack cleanout at the garage riser. Did not crawl the crawlspace. Walked home with the homeowner to explain.
|
Other | 5/4/2020 | 5/4/2020 | 5/4/2020 | P | DONE |
Matt Wrobel
|
|
|
Call ahead Conference before Final - Melissa Phone #: ###-#### consult
|
Other | 4/30/2020 | 4/30/2020 | 4/30/2020 | P | CANC |
Matt Wrobel
|
|
|
husband call to cancel*screened* conference - Melissa Phone #: ###-####
|
Water and/or Sewer | 3/4/2020 | 3/5/2020 | 3/5/2020 | P | PASS |
Matt Wrobel
|
|
|
I am requesting an inspection for the water and sewer line connection, so I can fill in the trenches. I was hoping you could come out around 12:00 if possible. I will have the sewer and water line service connection complete and would like to have it inspected. I will have the installation finished by 12:00 and that would enable me to get the trenches filled in as soon as possible, because I’m trying to prep for the concrete flatwork that is scheduled for tomorrow. I took a day off work and rented a compactor so it would be really great if the 12:00 time would work out so I have time to finish the service connection in the morning and then you inspect it and then I have time to cover it and get the driveway prepped for concrete tomorrow. I appreciate it. If it’s not too much trouble, I would appreciate a call if 12:00 won’t work for you, Thank you. Phone #: ###-#### Inspection requested via web by Melissa Davies
|
DOC - Permit Finaled | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | PASS |
Matt Wrobel
|
|
|
|