MEC96-03484
| INSP - Final | 1/9/1997 | 1/10/1997 | 1/10/1997 12:00:00 AM | A | FAIL |
|
|
caulk garage penetrations and nail off GWB, finish installation
|
MEC96-03484
| INSP - Final | 1/9/1997 | 1/10/1997 | 1/10/1997 12:00:00 AM | A | FAIL |
|
|
caulk garage penetrations and nail off GWB, finish installation
|
BLD96-00252
| INSP - Masonry | 1/9/1997 | 1/10/1997 | 1/10/1997 12:00:00 AM | A | FAIL |
|
|
re-bar inadequate cover on #3 ties, special inspector log and scope of work letter not on site
|
BLD96-02360
| INSP - Framing/Rough-in | 1/9/1997 | 1/10/1997 | 1/10/1997 12:00:00 AM | A | NR |
|
|
need plumbing inspection
|
BLD97-00026
| INSP - Letter of compliance | 1/10/1997 | 1/10/1997 | 1/10/1997 12:00:00 AM | P | PASS |
|
|
retaining wall
|
BLD97-00026
| INSP - Final | 1/10/1997 | 1/10/1997 | 1/10/1997 12:00:00 AM | P | PASS |
|
|
|
MEC96-03428
| INSP - Gas log/ Fireplace | 1/10/1997 | 1/10/1997 | 1/10/1997 12:00:00 AM | P | NR |
|
|
caulk, finish installation
|
BLD96-01471
| INSP - Letter of compliance | 1/10/1997 | 1/10/1997 | 1/10/1997 12:00:00 AM | P | PASS |
|
|
|
BLD96-01471
| INSP - Final | 1/10/1997 | 1/10/1997 | 1/10/1997 12:00:00 AM | P | PASS |
|
|
|
BLD96-01913
| INSP - Final | 1/9/1997 | 1/10/1997 | 1/10/1997 12:00:00 AM | P | NR |
|
|
need public works, engineers letter, and finish structure
|
BLD96-02109
| INSP - Framing/Rough-in | 1/10/1997 | 1/10/1997 | 1/10/1997 12:00:00 AM | P | FAIL |
|
|
moisture in basement, engineer's letter of acceptance for walls poured w/o inspection, p/t or decay resistant wood, changes in design and drainage at interior walls needed.
|
BLD96-02109
| INSP - Framing/Rough-in | 1/10/1997 | 1/10/1997 | 1/10/1997 12:00:00 AM | P | PART |
|
|
upstairs only ok to insulate, need to nail strap top plates, brace trusses, need approved plan on site, ck hold downs at garage face.
|
MEC97-00077
| INSP - Rough-in & Gas Pressure | 1/10/1997 | 1/10/1997 | 1/10/1997 12:00:00 AM | P | FAIL |
|
|
gas test failed and 4" dryer vent in 3 1/2" hole
|
BLD1053889
| INSP - Letter of compliance | 1/10/1997 | 1/10/1997 | 1/10/1997 12:00:00 AM | P | PASS |
|
|
c/c issued
|
BLD1053889
| INSP - Final | 1/10/1997 | 1/10/1997 | 1/10/1997 12:00:00 AM | P | PASS |
|
|
|
BLD1055717
| INSP - Final | 1/10/1997 | 1/10/1997 | 1/10/1997 12:00:00 AM | P | FAIL |
|
|
not to approved plan
|
BLD1055717
| INSP - Conference | 1/10/1997 | 1/10/1997 | 1/10/1997 12:00:00 AM | P | FAIL |
|
|
attempted to explain changes from approved plan, finally asked them to contact general contractor
|