Inspections for the day of: Monday, January 10, 2000.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorWes Worcester
TitleBLD-COM/RES INSPECTOR
Phone #340-1490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-02391 BLD-Framing/Rough-in1/7/20001/10/20001/10/2000 12:00:00 AMAFAIL
Dale Behrman ###-####. Need plan, need shear inspection, truss not installed per engineering, VERSA lams nto to BCI specs, infiltrations package not done etc.
BLD99-02051 BLD-Framing/Rough-in1/7/20001/10/20001/10/2000 12:00:00 AMAFAIL
###-#### joel. 2hr. Area separation wall is incorrect and not to UL listed installation criteria.
BLD99-03003 BLD-Framing/Rough-in1/7/20001/10/20001/10/2000 12:00:00 AMAPASS
###-#### dan. Shear ok.
BLD99-03268 BLD-Framing/Rough-in1/10/20001/10/20001/10/2000 12:00:00 AMPCANC
brent ###-#### fr insp---cancel per brent
BLD99-02447 BLD-Framing/Rough-in1/10/20001/10/20001/10/2000 12:00:00 AMPFAIL
Will be calling you to set up appt. time so engineer can be there, too. No contact #, no call, no one at site.
BLD99-02822 BLD-Final1/10/20001/10/20001/10/2000 12:00:00 AMPFAIL
###-####-RANDY FN. C/N plus $42.00 - reinspection fee- not approved for occupancy.
MEC99-04183 Final1/10/20001/10/20001/10/2000 12:00:00 AMPPASS
FOR HOMEOWNER --- JOHNATHAN WORK ###-#### RE-INSP FN
MEC99-03612 Pressure Test1/10/20001/10/20001/10/2000 12:00:00 AMPPASS
pressure for added range ###-####
MEC00-00037 Final1/10/20001/10/20001/10/2000 12:00:00 AMPFAIL
###-#### joe
MEC00-00057 Final1/7/20001/10/20001/10/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/07/2000 at 10:51:27. Contact: .