MEC00-00053
| Final | 1/7/2000 | 1/10/2000 | 1/10/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/07/2000 at 15:47:32. Contact: ###-####. F/P ok.
|
MEC99-04141
| Final | 1/7/2000 | 1/10/2000 | 1/10/2000 12:00:00 AM | A | FAIL |
|
|
###-####. Strap vertical length of gas pipe connect gas at F/P.
|
MEC00-00016
| Final | 1/10/2000 | 1/10/2000 | 1/10/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/10/2000 at 08:15:45. Contact: ###-####. Final on furn. & WH ok.
|
MEC00-00011
| Rough-in | 1/10/2000 | 1/10/2000 | 1/10/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/10/2000 at 09:17:00. Contact: ###-####. Insulate R/A Y at attic. Strap R/A duct with 11/2 wide straps; strap up envir. Ducts off rafters.
|
MEC00-00011
| Pressure Test | 1/10/2000 | 1/10/2000 | 1/10/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/10/2000 at 09:17:21. Contact: ###-####. Gas ok.
|
MEC99-03852
| Final | 1/10/2000 | 1/10/2000 | 1/10/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/10/2000 at 10:43:35. Contact: ###-####. Relocate protection post; need stem on F/A damper.
|
MEC99-04369
| Rough-in | 1/7/2000 | 1/10/2000 | 1/10/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/07/2000 at 14:25:21. Contact: ###-####. R/I & gas ok.
|