PLM02-00049
| Plumbing Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/09/2002 at 12:22:55. Contact: ###-####.
|
PLM01-04247
| Water and/or Sewer | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 1/9/2002 2:50:34 PM plus 30' 1/10/2002 9:07:06 AM
|
PLM02-00067
| Plumbing Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | P | PASS |
|
|
r/i- tammy- ###-####
|
PLM01-03870
| Final | 1/10/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 08:35:20. Contact: ###-####. late late pm
|
PLM01-04247
| Water and/or Sewer | 1/10/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 330 On 1/10/2002 9:03:59 AM end of the line and stubs ok 1/10/2002 4:00:40 PM
|
PLM01-03752
| Groundwork | 1/8/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | P | PART |
|
|
###-#### start 4 hour test, sign inspection report after micron , chemical dis rooms waste piping 1/10/2002 2:01:11 PM
|