BLD01-00123
| BLD-Framing/Rough-in | 1/8/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | A | CANC |
|
|
CREG ###-####
|
BLD01-01621
| BLD-Footing | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | A | PART |
|
|
###-####. Ok except for the interior hold-down footings c/n posted . Also not they have added an exterior non bearing frost protected mono-slab footing to the front area bettween the existing bearing post supports this was not shown on plans to be done. 1/10/2002 5:12:13 PM
|
BLD01-02393
| BLD-Framing/Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | A | PART |
|
|
###-####. ok to sheetrock upper floor and partial lower floor areas unaffected by work at the fireplace. Stairs still need to be addressed. 1/10/2002 12:03:48 PM
|
BLD01-00737
| BLD-Conference | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | A | PART |
|
|
###-####.Went over fire stoping with cont and hilti rep. 1/10/2002 11:20:20 AM
|
BLD01-02660
| BLD-Framing/Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | A | PART |
|
|
###-#### ok to drywall. 1/10/2002 11:20:34 AM
|
BLD01-03284
| BLD-Framing/Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/09/2002 at 17:05:43. Contact: ###-####.
|
BLD00-03519
| BLD-Final | 1/10/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | P | CANC |
|
|
###-####
|
BLD01-00531
| BLD-Final | 1/10/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | P | CANC |
|
|
###-####
|
BLD01-03006
| BLD-Framing/Rough-in | 1/10/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | P | PART |
|
|
###-####. 18 in clearance at lower east door would be acccepable. 1/10/2002 3:19:18 PM
|