BLD01-03167
| FIRE-Final Inspection | 1/8/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-02724
| FIRE-Sprinkler Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | A | PASS |
|
|
###-#### james okay to cover 1/10/2002 8:46:36 AM
|
FIR01-00504
| INSP-Final Inspection | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/09/2002 at 15:05:57. Contact: ###-####. all tampers/flows, etc tested okay. need to add head in small room in basement and additional drain 1/10/2002 12:06:58 PM
|
BLD01-02690
| FIRE-Final Inspection | 1/10/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | P | PASS |
|
|
###-#### air balance report on site and meets design specs. 1/10/2002 2:11:15 PM
|
BLD00-03538
| FIRE-Final Inspection | 1/10/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by Inspector: 409 On 1/10/2002 12:04:13 PM c/n issued; exit signs; sprinkler head with tape on it; stairs cleaned of scaffolding etc. 1/10/2002 12:08:17 PM
|