MEC02-00094
| Pressure Test | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | A | FAIL |
|
|
###-####
|
BLD01-02596
| BLD-Framing/Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | A | PART |
|
|
###-####
ok to cover upper floor, east 1/2 of main floor, pending trades ok, // energy code ok in those areas 1/10/2002 12:53:35 PM
|
MEC02-00079
| Final | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/09/2002 at 17:21:42. Contact: ###-####.
|
BLD01-01560
| BLD-Framing/Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/09/2002 at 15:37:08. Contact: .
ext shear ok 1/10/2002 11:58:21 AM
|
BLD01-02184
| BLD-Framing/Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/09/2002 at 15:38:21. Contact: .ext shear ok , verify alternate hds at framing 1/10/2002 11:59:06 AM
|
BLD01-02279
| BLD-Framing/Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | P | FAIL |
|
|
###-####
not ready, no inspection made, need trades signed off 1/10/2002 3:00:45 PM
|
BLD01-01825
| BLD-Final | 1/10/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | P | PART |
|
|
###-####
temp. ok untill project is 100% 1/10/2002 1:49:59 PM
|
BLD01-02285
| BLD-Final | 1/10/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | P | PASS |
|
|
final , russ ###-#### 1/10/2002 10:08:37 AM
|
BLD02-00035
| BLD-Footing | 1/10/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | P | PART |
|
|
kevin-- ###-#### ft
wip 1/10/2002 3:16:51 PM
|
BLD01-00974
| BLD-Conference | 1/10/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by Inspector: 415 On 1/10/2002 2:04:56 PM
|
BLD01-01302
| BLD-Final | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | P | FAIL |
|
|
###-####
no inspection made, need trades finals 1/10/2002 3:30:37 PM
|
BLD00-03507
| BLD-Final | 1/9/2002 | 1/10/2002 | 1/10/2002 12:00:00 AM | P | FAIL |
|
|
###-####
no inspection made, need trades signed off 1/10/2002 3:31:43 PM
|