Inspections for the day of: Thursday, January 10, 2002.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00974 BLD-Final1/9/20021/10/20021/10/2002 12:00:00 AMAPASS
lora ###-#### no inspections during work checked fianl product looks ok 1/10/2002 9:49:12 AM
BLD01-02279 BLD-Framing/Rough-in1/9/20021/10/20021/10/2002 12:00:00 AMANR
###-#### stopped at site contractor said that he scheduled it for a pm inspection and that he was not ready asked if i would reschedule it for him 1/10/2002 9:28:43 AM
BLD01-02395 BLD-Other1/9/20021/10/20021/10/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 01/09/2002 at 12:00:30. Contact: ###-####. talked with contractor road to site is unpassable they are going to try monday after road freezes up 1/10/2002 9:26:39 AM
MEC02-00012 Rough-in1/9/20021/10/20021/10/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/09/2002 at 14:19:52. Contact: ###-####.
MEC02-00012 Pressure Test1/9/20021/10/20021/10/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/09/2002 at 14:20:05. Contact: ###-####.
BLD01-02952 BLD-Final1/9/20021/10/20021/10/2002 12:00:00 AMPNR
###-####
BLD01-02751 BLD-Framing/Rough-in1/10/20021/10/20021/10/2002 12:00:00 AMPPASS
###-#### framing ok to insulate still needs plumbing c/n items corrected befor cover. shear nailing ok ok to cover ext 1/10/2002 2:36:43 PM
BLD01-02279 BLD-Framing/Rough-in1/10/20021/10/20021/10/2002 12:00:00 AMPCANC
Scheduled by Inspector: 425 On 1/10/2002 9:29:21 AM
BLD01-00329 BLD-Final1/10/20021/10/20021/10/2002 12:00:00 AMPPASS
###-#### c.c #20983 issued 1/10/2002 3:29:29 PM
BLD01-01188 BLD-Final1/10/20021/10/20021/10/2002 12:00:00 AMPNR
###-####
BLD01-00332 BLD-Final1/10/20021/10/20021/10/2002 12:00:00 AMPFAIL
###-#### c/n on site needs elec c/n finished and finaled 1/10/2002 3:30:49 PM
BLD01-02952 BLD-Energy code compliance1/10/20021/10/20021/10/2002 12:00:00 AMPPASS
Added by Inspector: 425 On 1/10/2002 2:55:43 PM
BLD01-02952 BLD-Framing/Rough-in1/10/20021/10/20021/10/2002 12:00:00 AMPPASS
Added by Inspector: 425 On 1/10/2002 2:56:11 PM
BLD01-00330 BLD-Final1/10/20021/10/20021/10/2002 12:00:00 AMPPASS
Added by Inspector: 425 On 1/10/2002 3:37:37 PM c.c #20984 issued