PLM00-03554
| Final | 1/6/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 01/06/2003 at 13:39:00. Contact: ###-####. just needs to set the fixtures 1/10/2003 9:46:54 AM
|
PLM03-00020
| Plumbing Rough-in | 1/9/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | A | PASS |
|
|
###-#### ri ok 1/10/2003 9:32:43 AM
|
PLM02-03263
| Final | 1/10/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/10/2003 at 08:38:02. Contact: ###-####. final ok 1/10/2003 3:09:00 PM
|
PLM02-03364
| Final | 1/10/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | P | NH |
|
|
Scheduled by a contractor via Hello! on 01/10/2003 at 08:39:16. Contact: ###-####. all taped closed must have finished the floors will recall when its safe 1/10/2003 3:08:49 PM
|
PLM03-00053
| Water and/or Sewer | 1/9/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | P | PASS |
|
|
after 4:00 final ok 1/10/2003 4:22:40 PM
|
PLM02-03493
| Plumbing Rough-in | 1/9/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | P | PASS |
|
|
just check the water repipe in the crawl ri ok 1/10/2003 2:46:26 PM
|