FIR02-00511
| INSP-Sprinkler Rough-in/Hydro | 1/10/2003 | 1/10/2003 | 1/10/2003 10:25:07 AM | P | CANC |
|
|
Rick Can you Look at this to when you are at Lake point today; Phone #: ###-#### Internet Inspection Request from: Mike Timmerman Inspection cancelled from web by: Mike Timmerman
|
FIR02-00350
| FIR-Aging Inspection | 1/10/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | | PART |
|
|
left message with Dan B. asking about status 1/10/2003 8:27:08 AM
|
FIR02-00005
| INSP-Sprinkler Rough-in | 1/10/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | A | FAIL |
|
|
heads below 22 inches and numerous obstructed in Area A in catwalk area for baggage handling system
|
BLD02-01716
| FIRE-Conference | 1/9/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/09/2003 at 13:39:54. Contact: ###-####. checked first fire door where it passes through area separation wall; fusible link to deck and at 2nd floor fusible link cuts through sheetrock; will need plate to prevent obstructing release of the cable 1/10/2003 10:12:39 AM
|
FIR02-00348
| INSP-Alarm Testing | 1/8/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | P | FAIL |
|
|
Rick at 1:00 PM if Possible
Thanks Mike; Phone #: ###-#### Internet Inspection Request from: Mike Timmerman need shunt trip for elevator shutdown; change maps to reflect combining zone 8 to 6 1/10/2003 3:53:12 PM
|
FIR02-00511
| INSP-Alarm Testing | 1/10/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | P | PASS |
|
|
Rick can we look at this at lake point when you are there today
thanks mike; Phone #: ###-#### Internet Inspection Request from: Mike Timmerman
|