BLD01-01477
| BLD-Conference | 1/5/2004 | 1/6/2003 | | A | |
|
|
donna ###-#### -call 1st before insp
|
MIS02-00229
| MIS-Aging Inspection | 1/10/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | | CANC |
|
|
scheduled final 1/13/2003 9:28:44 AM
|
MIS02-00275
| MIS-Aging Inspection | 1/10/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | | DONE |
|
|
permit was obtained 1/10/2003 8:00:47 AM
|
BLD02-02981
| BLD-Footing | 1/9/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | A | FAIL |
|
|
###-####
c/n posted, need soil report, and letter of approval for setback from slope 1/10/2003 10:06:00 AM
|
BLD02-02310
| BLD-Final | 1/9/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | A | PASS |
|
|
Demo - please confirm if final - thanks - call me, Cathy ~
|
BLD98-01745
| BLD-Conference | 1/9/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | A | DONE |
|
|
###-####
conf on final 1/10/2003 11:14:16 AM
|
BLD02-02866
| BLD-Energy code compliance | 1/9/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC98-01899
| Conference | 1/9/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | A | DONE |
|
|
renie-- cell ###-####
conf. on final 1/10/2003 11:14:29 AM
|
BLD02-02854
| BLD-Framing/Rough-in | 1/9/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 01/09/2003 at 16:37:04. Contact: ###-####.
|
BLD02-02248
| BLD-Framing/Rough-in | 1/9/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | P | PART |
|
|
ALAN; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
ext shear ok 1/13/2003 7:58:13 AM
|
MEC03-00037
| Pressure Test | 1/9/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | P | PART |
|
|
pres test- pete ###-####--call 1st before insp
gas co. will do pt 1/13/2003 7:59:01 AM
|
BLD02-02854
| BLD-Framing/Rough-in | 1/10/2003 | 1/10/2003 | 1/10/2003 12:00:00 AM | P | PART |
|
|
c/n posted, ok to insulate 1/13/2003 7:58:34 AM
|