FIR05-00400
| INSP-Final Inspection | 1/9/2006 | 1/10/2006 | 1/10/2006 5:14:57 PM | P | FAIL |
|
|
Need to test alarms when complete, provide calc. sticker, pressure relief valve, main drain sign, perform forward flow, backflow certification, "911 sign" at bell, complete items on c/n. Overhead hydro test passed inspection at this time.
|
FIR05-00722
| INSP-Sprinkler Rough-in/Hydro | 1/9/2006 | 1/10/2006 | 1/10/2006 3:48:16 PM | P | FAIL |
|
|
Need to provide a head for coverage below an overhead door that has been installed, the shell permit must be finaled prior to approval of this TI work.
|
FIR05-00721
| INSP-Sprinkler Rough-in/Hydro | 1/9/2006 | 1/10/2006 | 1/10/2006 3:46:29 PM | P | FAIL |
|
|
Hanger attatchments at two locations are improperly installed, need a ceiling and sprinkler head installed at storage closet, cooler and related heads are not complete at this time.
|
FIR05-00782
| INSP-Sprinkler Rough-in/Hydro | 1/9/2006 | 1/10/2006 | 1/10/2006 3:43:06 PM | P | FAIL |
|
|
One hanger attatchment on an arm-over is improperly installed, need to final the shell permit prior to approval of this TI permit, field ceiling tile should not be installed previous to an overhead rough-in inspection.
|
FIR05-00783
| INSP-Sprinkler Rough-in/Hydro | 1/9/2006 | 1/10/2006 | 1/10/2006 3:33:47 PM | P | FAIL |
|
|
Provide a ceiling and sprinkler head for the water heater closet, an additional row of sprinklers has been added to meet density requirements due to ceiling grid layout.
|
BLD05-03161
| FIRE-Final Inspection | 1/10/2006 | 1/10/2006 | 1/10/2006 2:05:57 PM | P | PASS |
|
|
|
BLD05-02816
| FIRE-Final Inspection | 1/10/2006 | 1/10/2006 | 1/10/2006 10:50:27 AM | A | PASS |
|
|
Fire life safety is satisfactory, no signature card available on site.
|
FIR05-00425
| INSP-Sprinkler Rough-in/Hydro | 1/10/2006 | 1/10/2006 | 1/10/2006 10:45:19 AM | A | DEFR |
|
|
Duplicate inspection request for hydro completed on 1/9.
|