FIR05-00400
             | INSP-Final Inspection | 1/9/2006 | 1/10/2006 | 1/10/2006 5:14:57 PM | P | FAIL | 
                      | 
                        
                        
                             | 
                            
                                 Need to test alarms when complete, provide calc. sticker, pressure relief valve, main drain sign, perform forward flow, backflow certification, "911 sign" at bell, complete items on c/n.  Overhead hydro test passed inspection at this time. 
             | 
		
			
                 
    
        FIR05-00722
             | INSP-Sprinkler Rough-in/Hydro | 1/9/2006 | 1/10/2006 | 1/10/2006 3:48:16 PM | P | FAIL | 
                      | 
                        
                        
                             | 
                            
                                 Need to provide a head for coverage below an overhead door that has been installed, the shell permit must be finaled prior to approval of this TI work. 
             | 
		
			
                 
    
        FIR05-00721
             | INSP-Sprinkler Rough-in/Hydro | 1/9/2006 | 1/10/2006 | 1/10/2006 3:46:29 PM | P | FAIL | 
                      | 
                        
                        
                             | 
                            
                                 Hanger attatchments at two locations are improperly installed, need a ceiling and sprinkler head installed at storage closet,  cooler and related heads are not complete at this time. 
             | 
		
			
                 
    
        FIR05-00782
             | INSP-Sprinkler Rough-in/Hydro | 1/9/2006 | 1/10/2006 | 1/10/2006 3:43:06 PM | P | FAIL | 
                      | 
                        
                        
                             | 
                            
                                 One hanger attatchment on an arm-over is improperly installed, need to final the shell permit prior to approval of this TI permit, field ceiling tile should not be installed previous to an overhead rough-in inspection. 
             | 
		
			
                 
    
        FIR05-00783
             | INSP-Sprinkler Rough-in/Hydro | 1/9/2006 | 1/10/2006 | 1/10/2006 3:33:47 PM | P | FAIL | 
                      | 
                        
                        
                             | 
                            
                                 Provide a ceiling and sprinkler head for the water heater closet, an additional row of sprinklers has been added to meet density requirements due to ceiling grid layout. 
             | 
		
			
                 
    
        BLD05-03161
             | FIRE-Final Inspection | 1/10/2006 | 1/10/2006 | 1/10/2006 2:05:57 PM | P | PASS | 
                      | 
                        
                        
                             | 
                            
                                
             | 
		
			
                 
    
        BLD05-02816
             | FIRE-Final Inspection | 1/10/2006 | 1/10/2006 | 1/10/2006 10:50:27 AM | A | PASS | 
                      | 
                        
                        
                             | 
                            
                                 Fire life safety is satisfactory, no signature card available on site. 
             | 
		
			
                 
    
        FIR05-00425
             | INSP-Sprinkler Rough-in/Hydro | 1/10/2006 | 1/10/2006 | 1/10/2006 10:45:19 AM | A | DEFR | 
                      | 
                        
                        
                             | 
                            
                                 Duplicate inspection request for hydro completed on 1/9. 
             |