Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS05-00228 FIR-Final1/10/20061/10/20061/10/2006 3:52:50 PMPPASS
Life safety finaled
FIR05-00604 INSP-Sprinkler Rough-in1/9/20061/10/20061/10/2006 3:21:28 PMPFAIL
Provide through bolts for the earth quake bracing on the main level. Finish installing upright sprinkler heads in the overbuilds. The main overbuild needs one more upright head for correct coverage. The overbuilds need reinspection. Riser not inspected.
FIR05-00029 INSP-Supply line flush1/10/20061/10/20061/10/2006 3:17:29 PMPPASS
Underground supply line flush passed.
FIR05-00664 INSP-Final Inspection1/9/20061/10/20061/10/2006 1:44:28 PMPCANC
Per the electrician the mechanical systems are dismantled and non functional at this point. No inspection performed.
FIR05-00605 INSP-Final Inspection1/10/20061/10/20061/10/2006 1:43:31 PMPFAIL
Monitoring not set up. No tampers on the two control valves. Per notes plans need to be resubmitted for the additional valve.
FIR04-00684 INSP-Sprinkler Rough-in/Hydro1/10/20061/10/20061/10/2006 12:36:17 PMAPART
Above ground hydro tests passed. Sprinkler devices on wet sytem passed alarm inspection.
FIR05-00104 INSP-Alarm Testing1/10/20061/10/20061/10/2006 11:52:07 AMAPART
Today we tested the fire alarm panel itself and the interconnections between it and the NAC panels. We also tested were the smoke detectors over the panels. Also tested was the wet system tamper switches and flow switches for all floors. I found one duct smoke detector that needs relocated and the north fourth floor manual pull did not work.