Inspections for the day of: Wednesday, January 10, 2007.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00830 INSP-Final Inspection1/10/20071/10/20071/10/2007 4:16:43 PMPFAIL
Project is not ready for a final. Infact plans need to be resubmitted showing the 2" drop down branchlines not forming a loop and also if the ceiling on the second floor is installed as discussed with Terry there will be combustible concealed spaces that will need to be delt with.
BLD06-03009 FIRE-Alarm Testing1/10/20071/10/20071/10/2007 4:08:22 PMPPASS
The duct smoke detectors operated correctly.
FIR06-00810 INSP-Final Inspection1/10/20071/10/20071/10/2007 3:05:12 PMPFAIL
One of the two duct detectors has been deleted. Per Mike Timmerman and I this detector needs to be installed as per the plans or the hvac unit needs to be removed. The one duct smoke detector that was installed has the sample tube installed backwards and pointing the wrong way. Also the donuts behind the detector are missing as well as the foam filters. I tested it anyway and it did shut the hvac unti down.
FIR06-00755 INSP-Sprinkler Rough-in1/10/20071/10/20071/10/2007 3:02:11 PMPPART
See the city approved plans for the area of underground piping that can covered.
FIR06-00440 INSP-Supply line flush1/9/20071/10/20071/10/2007 12:15:55 PMPFAIL
kurt; Phone #: ###-#### I called 30 minutes before inspection and got no answer. Nobody at job site knew of kurt. Riser was not set up for flush either. Will need to be rescheduled.
MIS06-00339 FIR-Final1/9/20071/10/20071/10/2007 11:49:59 AMAPASS
life safety passed
FIR06-00631 INSP-Sprinkler Rough-in/Hydro1/9/20071/10/20071/10/2007 11:32:55 AMAFAIL
The attic sprinkler heads are too close to the deck and a high temp pendant will be required above the unit heater. Hydro test failed due to loss of pressure and now the changes in the attic heads that is required.
FIR05-00029 INSP-Final Inspection1/9/20071/10/20071/10/2007 10:36:56 AMAFAIL
See city approved plans for items still needing completed.
FIR06-00733 INSP-Sprinkler Rough-in/Hydro1/9/20071/10/20071/10/2007 10:28:29 AMAPART
Overhead hydro test passed for the wet system. 24 hour air test started on the dry system at 8:30 with 40 3/4psi on the guage.