BLD11-02455
| FIRE-Conference | 1/10/2012 | 1/10/2012 | 1/11/2012 5:01:53 PM | P | DONE |
|
|
On site visit regarding manual pull box locations for activation of the hood suppression systems per IFC requirements.
|
BLD11-02317
| FIRE-Conference | 1/10/2012 | 1/10/2012 | 1/11/2012 4:55:12 PM | P | DONE |
|
|
On site visit with fire sprinkler contractor regarding demo work, project schedule, existing deficiencies, etc.
|
FIR11-00496
| INSP-Sprinkler Rough-in | 1/9/2012 | 1/10/2012 | 1/11/2012 7:35:30 AM | A | PART |
|
|
Overhead rough-in inspection at the second floor south half completed. See dated and marked locations on plan set.
|
BLD11-02594
| FIRE-Final Inspection | 1/9/2012 | 1/10/2012 | 1/10/2012 12:29:56 PM | A | PASS |
|
|
Contractor to provide a current tag on the fire extinguisher and post "door to remain.. " signage at the main entry/exit prior to structural final for verification as agreed.
|
BLD11-02454
| FIRE-Final Inspection | 1/9/2012 | 1/10/2012 | 1/10/2012 12:27:11 PM | A | PASS |
|
|
Correction items verified for completion. Life safety inspection passed.
|