FIR12-00748
| INSP-Final Inspection | 1/7/2013 | 1/10/2013 | 1/10/2013 3:50:49 PM | P | PASS |
|
|
Permit finaled
|
BLD12-03046
| FIRE-Conference | 1/10/2013 | 1/10/2013 | 1/10/2013 3:10:38 PM | P | DONE |
|
|
I went over life safety requirements with the builder. Specifically the exit sign placement and the apparent need for a fire alarm permit due to the Mechanical drawings indicating two new duct smoke detectors on RTU-1 abd RTU-2.
|
BLD12-02452
| FIRE-Sprinkler Rough-in | 1/8/2013 | 1/10/2013 | 1/10/2013 2:24:53 PM | A | DONE |
|
|
Inspection was actually for a conference for Frank Matson. We discussed sprinkler issues due to a new wall. From information provided over the phone the pendant head is not too close to the wall at 8".
|
FIR12-00722
| INSP-Sprinkler Rough-in/Hydro | 1/9/2013 | 1/10/2013 | 1/10/2013 1:10:17 PM | A | CANC |
|
|
Wrong inspection type called in. Permit can be finaled when the correct permit type is called in.
|
BLD12-02452
| FIRE-Sprinkler Rough-in | 1/8/2013 | 1/10/2013 | 1/10/2013 1:09:08 PM | A | CANC |
|
|
Duplicate inspection
|
FIR12-00628
| INSP-Final Inspection | 1/9/2013 | 1/10/2013 | 1/10/2013 1:08:44 PM | A | FAIL |
|
|
At the time of inspection the plans had not been resubmitted with the plan modifications. I did perform and pass the overhead hydro test.
|
BLD11-03012
| FIRE-Final Inspection | 1/10/2013 | 1/10/2013 | 1/10/2013 10:37:33 AM | A | PASS |
|
|