ESC10-00495
| Complaint Inspection | 1/10/2013 | 1/10/2013 | 1/10/2013 3:41:43 PM | A | DONE |
|
|
All area are covered in deep snow. Could not verify visually if measure have been implimented for temporary stabilization. But per the the schedule submitted by the developer those area have and will be stabilized after the phased work is complete.
|