FIR16-00337
| INSP-Final Inspection | 1/9/2017 | 1/10/2017 | 1/10/2017 11:36:09 AM | A | FAIL |
|
|
Resubmit plans showing the corrected alarm activation as per discussion and address all of the items listed in the review comments. Provide "abort" outside of the room as per review note #4. provide signage and door sweep as per discussion. Raise the first and third floor nozzles to within 12" of ceiling as per notes on plans. All three wall mounted strobes are overspaced. Provide ceiling in the first floor "releasing panel room". We need to test all of the devices. Get approval to relocate the manual pull station to the inside of the room.
|
FIR16-00310
| INSP-Final Inspection | 1/6/2017 | 1/10/2017 | 1/10/2017 11:32:18 AM | A | FAIL |
|
|
Not ready for a final inspection due to fire alarm issues. However the rough-in passed.
|
BLD16-00390
| FIRE-Final Inspection | 1/9/2017 | 1/10/2017 | 1/10/2017 9:43:28 AM | A | FAIL |
|
|
Repair or remove the exit signs and emergency lights. Provide annual inspection for the two fire extinguishers.
|
BLD16-03751
| FIRE-Final Inspection | 1/9/2017 | 1/10/2017 | 1/10/2017 7:07:36 AM | A | PASS |
|
|
life safety passed
|