BLD15-04407
| BLD-Final | 1/9/2017 | 1/10/2017 | 1/10/2017 3:22:14 PM | A | NR |
|
|
Request for final inspection. Phone #: ###-#### Inspection requested via web by jason epperson. Contractor has received DRH approval letter for exterior work. Architect of record will need to upload a plan modification in Eplan review for the additional work done. After plan review has been completed, then a zoning final will need to be scheduled and completed. A building final may then be scheduled and any further inspections if required on the exterior work will be determined at that time. I also contacted the general contractor (Jason Eperson) and left him a voice mail detailing the next required steps. I aslo received a letter from the engineer of record approving work done on soffits.
|
MIS16-00264
| DOC - Permit Finaled | 1/10/2017 | 1/10/2017 | 1/10/2017 1:59:37 PM | P | PASS |
|
|
Should have finaled on initial visit.
|
BLD16-00446
| DOC - Permit Finaled | 1/10/2017 | 1/10/2017 | 1/10/2017 1:58:41 PM | P | PASS |
|
|
|
MIS16-00282
| BLD-Conference | 12/27/2016 | 1/10/2017 | 1/10/2017 1:35:38 PM | A | PEND |
|
|
Check on CO. status.
|
BLD16-03771
| BLD-Energy code compliance | 1/9/2017 | 1/10/2017 | 1/10/2017 1:19:23 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD16-02639
| BLD-Final | 1/9/2017 | 1/10/2017 | 1/10/2017 1:19:06 PM | P | PASS |
|
|
Call for access // Jared Phone #: ###-####. All issues were resolved. Ok for perm. occ.
|
BLD16-03394
| BLD-Energy code compliance | 1/9/2017 | 1/10/2017 | 1/10/2017 11:53:43 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD16-02992
| BLD-Framing/Rough-in | 1/9/2017 | 1/10/2017 | 1/10/2017 11:25:59 AM | A | PASS |
|
|
Dustin Phone #: ###-####. Ok to cover furred walls.
|
BLD16-03771
| BLD-Energy code compliance | 1/9/2017 | 1/10/2017 | 1/9/2017 5:24:11 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
|