MEC17-03487
| Final | 1/3/2018 | 1/10/2018 | 1/10/2018 3:31:42 PM | P | CANC |
|
|
Call ahead to Chris @ ###-#### = homeowner. Phone #: ###-#### Inspection requested via web by Angie Maguire- need flue issues addressed
|
MEC17-03487
| Pressure Test | 1/3/2018 | 1/10/2018 | 1/10/2018 3:28:08 PM | P | FAIL |
|
|
please pressure test flue. Home owner = Chris @ ###-#### Phone #: ###-#### Inspection requested via web by Angie Maguire- not holding pressure- COs installed
|
MEC18-00119
| Rough-in | 1/10/2018 | 1/10/2018 | 1/10/2018 2:16:44 PM | P | PART |
|
|
Inspection requested via web by Karl Hestekin- need to figure out whos responsible for gas piping to home- pressure is above 20lb on gauge- need to install master bath fan per homeowner- range hood duct ?- need crawl completed too- Karl checking into these issues
|
MEC18-00041
| Final | 1/9/2018 | 1/10/2018 | 1/10/2018 11:43:26 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jerry Crist- mini split ok
|
MEC17-04232
| Final | 1/9/2018 | 1/10/2018 | 1/10/2018 10:27:59 AM | A | PART |
|
|
Site contact: Rick Manske fire safety administration building. Phone #: ###-#### Inspection requested via web by Melissa Kaae- ceiling ok to install ceiling tiles- duct work flex all good- need air balance report for final inspection
|
MEC17-05183
| Rough-in | 1/9/2018 | 1/10/2018 | 1/10/2018 9:43:53 AM | A | PASS |
|
|
Ceiling cover inspection Phone #: ###-#### Inspection requested via web by RaChelle Frisbee- ceiling ok to cover and install ceiling tiles
|
MEC17-04710
| Conference | 1/9/2018 | 1/10/2018 | 1/10/2018 9:18:59 AM | A | PASS |
|
|
Doing Duct Blast 1/10/18 @ 9:00 am Phone #: ###-#### Inspection requested via web by Konrad Swartz- duct blast test pass both units
|