ELE13-03227
| ELE-Aging Inspection | 1/10/2018 | 1/10/2018 | 1/11/2018 10:38:43 AM | | DONE |
|
|
unable to make contact
|
ELE13-03214
| ELE-Aging Inspection | 1/10/2018 | 1/10/2018 | 1/10/2018 2:57:28 PM | | FAIL |
|
|
still waiting on contractor to verify work and schedule inspections
|
ELE18-00083
| Electrical Rough-In | 1/10/2018 | 1/10/2018 | 1/10/2018 2:55:51 PM | P | PASS |
|
|
Try again maybe. lol Phone #: ###-#### Inspection requested via web by Kurtis Boller...rough in ok to cover...master bedroom and bath addition/remodel...future work in kitchen, patio, and porch done at later date on seperate permit
|
ELE16-03793
| Electrical Rough-In | 1/10/2018 | 1/10/2018 | 1/10/2018 2:22:32 PM | P | PASS |
|
|
CONTACT: JEREMY THORNOCK Phone #: ###-#### Inspection requested via web by Deb Gooden...ceiling grid bldg 300 ok
|
ELE17-02577
| Permanent Service | 1/10/2018 | 1/10/2018 | 1/10/2018 1:27:09 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kendall bender....perm service for Ace Hardware ok...L/O on breaker can be removed 200A panel in vacant tennant space ok-no meter to be installed
|
ELE18-00120
| Electrical Rough-In | 1/10/2018 | 1/10/2018 | 1/10/2018 12:34:52 PM | P | PASS |
|
|
we are requesting a rough-in inspection in the front office area of this project. The owner site rep is also curious if this building has out dated switch gear, if time permits a consultation on the gear would be appreciated. Contact is Curtis Burnie ###-#### Phone #: ###-#### Inspection requested via web by Larry Looney...wall cover for new offices ok...verified floor outlets from previous discussion with Curtis from ESI ok...consultation on switch gear done-work looks to code, no violations were visible for switch gear, discussed 2 visible code violations on existing lighting that need fixed, all new work shall be to current code and verified at final
|
ELE17-03432
| Permanent Service | 1/9/2018 | 1/10/2018 | 1/10/2018 11:42:24 AM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Mark Morgan...per contractor rescheduled for next day AM first thing
|
MIS18-00009
| ELE-Conference | 1/10/2018 | 1/10/2018 | 1/10/2018 11:35:42 AM | A | DONE |
|
|
electrical work without permit...converting garage into living space...new wiring installed...stop work order posted
|
ELE18-00108
| Final | 1/9/2018 | 1/10/2018 | 1/10/2018 11:34:28 AM | A | PASS |
|
|
Tenant name is Sarah and please call when on your way. Phone #: ###-#### Inspection requested via web by Jose Guerrero...job complete no corrections..ok to final
|
ELE18-00108
| Electrical Rough-In | 1/10/2018 | 1/10/2018 | 1/10/2018 11:33:43 AM | P | PASS |
|
|
Tenant name is Sarah and please call when on your way. Phone #: ###-#### Inspection requested via web by Jose Guerrero...new circuit to disconnect for mini split and service outlet added..ok
|
ELE18-00117
| Final | 1/9/2018 | 1/10/2018 | 1/10/2018 10:54:51 AM | A | FAIL |
|
|
Chad VanOrden is contact at ###-####. thanks. Phone #: ###-#### Inspection requested via web by Debby Pierce... 1) work has been done outside the scope of this permit with no insp[ection
A hold has been placed on BLD17-04485 NO Final will be done until a permit is pulled for work that was done
The General contractor shall produce name of contractor that did electrical work and have permits assigned and inspections done before any permit shall be finaled
|
ELE18-00057
| Temporary Service | 1/9/2018 | 1/10/2018 | 1/10/2018 9:48:51 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn....t/s u/g new ok
|
ELE18-00058
| Temporary Service | 1/9/2018 | 1/10/2018 | 1/10/2018 9:47:32 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn...t/s u/g new ok
|
ELE18-00112
| Final | 1/10/2018 | 1/10/2018 | 1/10/2018 9:27:45 AM | A | PASS |
|
|
no corrections...job complete...ok to final
|
ELE18-00112
| Rough-In Permanent Service | 1/9/2018 | 1/10/2018 | 1/10/2018 9:25:59 AM | A | PASS |
|
|
Please ca when done Phone #: ###-#### Inspection requested via web by Thomas wilson.. feeding new mobile home off existing power pole with power...homeowner has permit on power pole and is finaled...direct barial wire and sch80 pvc used where needed...ok
|
ELE17-03186
| Final | 1/9/2018 | 1/10/2018 | 1/10/2018 8:42:17 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ben Archibald...ok to final
|
ELE18-00110
| Temporary Service | 1/9/2018 | 1/10/2018 | 1/9/2018 4:32:29 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Heath Thomas Inspection cancelled from web by: Heath Thomas
|