MEC18-00054
| Rough-in | 1/10/2018 | 1/10/2018 | 1/10/2018 2:44:49 PM | P | PASS |
|
|
Inspection requested via web by Konrad Swartz
|
MEC18-00050
| Pressure Test | 1/10/2018 | 1/10/2018 | 1/10/2018 2:22:02 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves Need 20# test water heater and furnace flue at 5# ok
|
MEC18-00050
| Rough-in | 1/10/2018 | 1/10/2018 | 1/10/2018 2:21:07 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves gas test failed, 1/2" gas pipe to range needs to be hung every 6' metal elbow to exhaust fan requires 3 screws and sealed
|
MEC18-00051
| Pressure Test | 1/10/2018 | 1/10/2018 | 1/10/2018 2:19:07 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves 5# test to w/h flue and furnace 20# test gas
|
MEC18-00051
| Rough-in | 1/10/2018 | 1/10/2018 | 1/10/2018 2:18:21 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves
|