BLD17-03734
| BLD-Framing/Rough-in | 1/9/2018 | 1/10/2018 | 1/10/2018 5:29:20 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tom Wells
|
BLD17-03969
| BLD-Energy code compliance | 1/9/2018 | 1/10/2018 | 1/10/2018 3:15:28 PM | P | PASS |
|
|
After 2 pm if possible please. Phone #: ###-#### Inspection requested via web by Tom Wells
|
BLD17-03581
| BLD-Footing | 1/9/2018 | 1/10/2018 | 1/10/2018 3:05:38 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD16-04474
| BLD-Wall Bracing | 1/10/2018 | 1/10/2018 | 1/10/2018 2:14:22 PM | P | FAIL |
|
|
Sam Phone #: ###-####. Complete install of holdowns and nail off missed areas.
|
BLD16-04473
| BLD-Wall Bracing | 1/10/2018 | 1/10/2018 | 1/10/2018 2:14:00 PM | P | FAIL |
|
|
Sam Phone #: ###-####. Complete install of holdowns and nail off missed areas.
|
BLD16-02757
| BLD-Framing/Rough-in | 1/10/2018 | 1/10/2018 | 1/10/2018 2:13:23 PM | P | FAIL |
|
|
Sam Phone #: ###-####. Unit has been insulated. Remove insulation for framing inspection.
|
BLD16-02743
| BLD-Energy code compliance | 1/10/2018 | 1/10/2018 | 1/10/2018 1:46:51 PM | P | PASS |
|
|
Sam Phone #: ###-####
|
BLD16-02744
| BLD-Energy code compliance | 1/10/2018 | 1/10/2018 | 1/10/2018 1:46:35 PM | P | PASS |
|
|
Sam Phone #: ###-####
|
BLD17-00553
| BLD-Energy code compliance | 1/9/2018 | 1/10/2018 | 1/10/2018 1:28:15 PM | P | PASS |
|
|
Thank you! Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD17-00058
| BLD-Framing/Rough-in | 1/9/2018 | 1/10/2018 | 1/10/2018 10:59:32 AM | A | PART |
|
|
Late am inspection please Phone #: ###-#### Inspection requested via web by Roger Graves. Add additional steel stud under joist for full bearing. 5/8 through bolts on side entry need to penetrate through osb, and stud back and connected with 1/4 inch washers and nut. ok to insulate. Also inspected in progress work on heavy timber connections on ground.
|
BLD16-04310
| BLD-Final | 1/9/2018 | 1/10/2018 | 1/10/2018 9:56:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs. Ok for temp occ. Will be ok for perm occ. once zoning and public works sign perm.
|
BLD17-04059
| BLD-Other | 1/9/2018 | 1/10/2018 | 1/10/2018 9:31:58 AM | A | PASS |
|
|
call 20 min before to meet // tie down insp // Victoriano Phone #: ###-####. Needs to provide frost protection for front (south) footing.
|
BLD17-04532
| BLD-Framing/Rough-in | 1/9/2018 | 1/10/2018 | 1/10/2018 9:17:27 AM | A | PASS |
|
|
Call half hour before to meet // Tim Phone #: ###-####. Interior steel stud framed walls ok.
|
BLD17-04480
| BLD-Foundation | 1/9/2018 | 1/10/2018 | 1/10/2018 8:35:49 AM | A | PART |
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|