Inspections for the day of: Thursday, January 10, 2019.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01366 Tracking Control1/7/20191/10/20191/11/2019 3:18:39 PMAFAIL
Trackout still occuring to Ormond Street and within the subdivsion. Workers onsite with loading moving material and driving through mud.

Request to GC to have them sweep up at end of day.
ESC18-01473 Tracking Control1/7/20191/10/20191/11/2019 3:10:32 PMPPASS
No new trackout. Trackout on Helen Street has been cleaned. Sidewalk swept after foundation backfill. No loose trash. Permits posted on Robert Street.
ESC18-00172 Tracking Control1/9/20191/10/20191/11/2019 3:04:20 PMAPASS
No trackout. No vehicles or equipment accessing site. Appears some road mix has been spread on the driveway area.
ESC17-01754 Tracking Control1/11/20191/10/20191/11/2019 8:08:19 AMPFAIL
No sweeping has occured on the shoulder and gutter of Federal Way as requested multiple times over the last month

Storm drain inlet at Targee and Federal Way SE bound has not sediment protection. Two other inlets on Federal Way SE of site need sediment protection.

Rock entrance all muddy, some additional rock placed in employee parking area but Hudson is caked with mud.

Written correction notice posted
- sweep federal way SE bound from Targee to Latimer Street

ESC18-01651 General Inspection1/4/20191/10/20191/10/2019 2:59:30 PMPPASS
follow up on corrections
- concrete washout rock entrance
- wattles on house with slope on corner
- clean out full DIs


Corrections complete. New rock at washout, DI bags maintained/emptied. House down the way had sediment control wattle installed.
ESC18-01438 General Inspection1/4/20191/10/20191/10/2019 2:57:05 PMPPASS
follow up

Corrections completed as requested. Wattle installed on the south side of home as requested. DI bags have been maintained. Additional rock place at front of concrete washout to prevent trackout approved.
ESC18-00900 General Inspection1/9/20191/10/20191/10/2019 12:49:16 PMPFAIL
Corrections needed:

- clean up paved apron to construction entrance
- uncompact the rock in the entrance
- add more rock w/ lining to increase the length of the entrance.

Correction request left on RP John's voicemail

- possible work occuring on the parcel across the street.
ESC18-00979 General Inspection1/10/20191/10/20191/10/2019 12:47:36 PMPPASS
Construction entrance, lined large capacity washout, a perimeter sediment control wattles are installed. NO trackout or discharges observed.

Posted ESC permit sign at entrance. No corrections requested. Will need to maintain construction entrance soon. Follow up scheduled.
ESC18-00180 General Inspection1/10/20191/10/20191/10/2019 8:10:44 AM PEND
Corrections in progress. See ESC17-01687
ESC18-00122 General Inspection1/10/20191/10/20191/10/2019 8:10:30 AM PEND
Corrections in progress. See ESC17-01687