ELE17-02501
| ELE-Aging Inspection | 1/10/2020 | 1/10/2020 | 1/13/2020 6:01:59 AM | | DONE |
|
|
Please schedule a final inspection.
|
ELE20-00119
| Conference | 1/10/2020 | 1/10/2020 | 1/10/2020 2:53:36 PM | P | DONE |
|
|
Joe Ann Phone #: ###-#### Discussed load calc for wanting to add power to detached ADU. 100a brkr already installed in lower position of 200a meter main for house sub panel.
|
ELE19-04838
| Conference | 1/10/2020 | 1/10/2020 | 1/10/2020 1:50:25 PM | P | DONE |
|
|
Meet to look at pergola lights. Thanks Phone #: ###-#### Inspection requested via web by Eric Brown Discussed running power for heaters in pergola.
|
ELE19-04903
| Final | 1/10/2020 | 1/10/2020 | 1/10/2020 1:16:10 PM | P | PASS |
|
|
Pls contact Brad (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes Ok final. Line side connection
|
ELE19-03916
| Final | 1/9/2020 | 1/10/2020 | 1/10/2020 11:45:01 AM | A | NH |
|
|
Please call Ben ###-#### for access info. If you have any questions please feel free to contact Chaz ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan No access. Called and left message at 925, no return call.
|
ELE19-03779
| Final | 1/9/2020 | 1/10/2020 | 1/10/2020 11:37:05 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Chris Berthelot Ok final. Existing light opening to be covered with siding and no longer used.
|
ELE20-00027
| Rough-In Permanent Service | 1/9/2020 | 1/10/2020 | 1/10/2020 11:03:27 AM | A | PASS |
|
|
wont be there, front door has no lock, house , garage and service ready have a question about being able to have main breaker panel inside by door instead of disconnect on outside Phone #: ###-#### Inspection requested via web by dennis mcneely Ok cover. p/s o/h n ok
|
ELE19-03990
| Final | 1/8/2020 | 1/10/2020 | 1/10/2020 10:19:45 AM | A | PASS |
|
|
Owner will be here in am Phone #: ###-#### Inspection requested via web by Kendra Lanham Ok final kitchen.
|
ELE19-04921
| Final | 1/9/2020 | 1/10/2020 | 1/10/2020 9:49:58 AM | A | PASS |
|
|
call first, ###-#### Phone #: ###-#### Inspection requested via web by PAT MILLER Ok final. 30a max fuse, 25a fuses installed and service recept.
|
ELE19-04714
| Final | 1/9/2020 | 1/10/2020 | 1/10/2020 9:32:45 AM | A | PASS |
|
|
Josh Phone #: ###-#### Ok final. p-8 installed and 1 blank.
|
ELE19-01928
| Final | 1/8/2020 | 1/10/2020 | 1/10/2020 9:07:04 AM | A | PASS |
|
|
Please send me a text with ETA. Thank you! Marisa Phone #: ###-#### Inspection requested via web by Marisa Weppner Ok final. Corrections made.
|
ELE20-00106
| Conference | 1/9/2020 | 1/10/2020 | 1/10/2020 9:06:37 AM | A | DONE |
|
|
Call ahead // Ted Phone #: ###-#### Discussed wire size, disc and ufer for outdoor, covered seating area. Mentioned load calc. About 6-7 twins already in panel, wants to feed 50a out to stucture
|
ELE19-04838
| Conference | 1/10/2020 | 1/10/2020 | 1/10/2020 8:54:23 AM | P | CANC |
|
|
Meet to look at pergola lights Phone #: ###-#### >> Inspection requested via web by mike brown Inspection cancelled from web by: Eric Brown
|