Inspections for the day of: Tuesday, January 11, 2000.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-02806 BLD-Framing/Rough-in1/10/20001/11/20001/11/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/10/2000 at 22:19:45. Contact: ###-####. C/N: seismic pods, wires; fireblocking.
BLD99-01410 BLD-Framing/Rough-in1/10/20001/11/20001/11/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/10/2000 at 22:21:20. Contact: ###-####. Keep C/N; ok to cover vault areas & ext. walls.
BLD99-01785 BLD-Framing/Rough-in1/10/20001/11/20001/11/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/10/2000 at 22:26:57. Contact: ###-####. West & North side canopy.. WIP.
BLD99-03622 BLD-Framing/Rough-in1/10/20001/11/20001/11/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/10/2000 at 13:33:59. Contact: ###-####. Int. walls ok.
BLD99-01162 BLD-Conference1/11/20001/11/20001/11/2000 12:00:00 AMAPASS
w/Bldr. (framer) re: C/N of 1/10/00.
BLD00-00022 BLD-Conference1/11/20001/11/20001/11/2000 12:00:00 AMAPASS
w/Dan Stuart re: project; have been unable to contact "owner" (St. Al's rep.). Permit to be issued.
BLD99-02874 BLD-Framing/Rough-in1/10/20001/11/20001/11/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/10/2000 at 16:36:09. Contact: ###-####. Ok to cover int. partitions.
BLD99-02745 BLD-Framing/Rough-in1/11/20001/11/20001/11/2000 12:00:00 AMPPART
jerry-- ###-#### fr insp. Office area only ok to cover, need Add'l fasteners at lid per ICBO T-7-C.
BLD99-02658 BLD-Framing/Rough-in1/11/20001/11/20001/11/2000 12:00:00 AMPPART
###-#### . Roof nailing ok.
BLD99-03542 BLD-Framing/Rough-in1/11/20001/11/20001/11/2000 12:00:00 AMPFAIL
all cards are on wall in shed\###-#### Jeff. C/N; nail brace panels, seal ext. walls.