BLD00-03120
| BLD-Wall cover | 1/9/2001 | 1/11/2001 | 1/11/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/09/2001 at 15:45:51. Contact: ###-####. c/n issued: 1) MST 10:33:56 AM 37 straps needed per plans; 2) shear nailing for # 4 spacing required; 3) nailing needed above hd straps 1/11/2001 10:34:38 AM 1/11/2001 10:35:31 AM
|
BLD00-03145
| BLD-Framing/Rough-in | 1/10/2001 | 1/11/2001 | 1/11/2001 12:00:00 AM | A | PART |
|
|
###-####c/n issued, additional nailing required plus installation of 2--37" straps on front of building. 1/11/2001 9:50:49 AM
|
BLD00-02028
| BLD-Final | 1/10/2001 | 1/11/2001 | 1/11/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/10/2001 at 13:01:03. Contact: ###-####. Needs plumbing final and window well ladder in basement bedroom for egress. 1/11/2001 8:50:48 AM
|
BLD00-02804
| BLD-Energy code compliance | 1/10/2001 | 1/11/2001 | 1/11/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/10/2001 at 13:14:40. Contact: ###-####. ok to cover 1/11/2001 9:02:42 AM
|
BLD00-03673
| BLD-Foundation | 1/11/2001 | 1/11/2001 | 1/11/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/11/2001 at 07:16:57. Contact: ###-####. Reviewed hd and rebar, not 100% completed at time of inspection. 1/11/2001 11:21:52 AM
|
BLD00-02026
| BLD-Conference | 1/11/2001 | 1/11/2001 | 1/11/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 420 On 1/11/2001 8:28:36 AM /Reviewed detail of proposed bathroom fan exhaust 1-Hr. chase detail. 1/11/2001 11:50:52 AM
|
BLD00-03001
| BLD-Framing/Rough-in | 1/10/2001 | 1/11/2001 | 1/11/2001 12:00:00 AM | A | PASS |
|
|
Don ###-#### shear wall insp. OK to side. 1/11/2001 10:56:24 AM
|
BLD00-03293
| BLD-Framing/Rough-in | 1/11/2001 | 1/11/2001 | 1/11/2001 12:00:00 AM | A | PASS |
|
|
Bob ###-####
|
BLD00-03129
| BLD-Framing/Rough-in | 1/10/2001 | 1/11/2001 | 1/11/2001 12:00:00 AM | P | FAIL |
|
|
###-#### SHEAR: Additional nailing required plus install block on upstairs shear panels where missing. 1/11/2001 2:04:30 PM c/n posted on site. 1/11/2001 2:04:47 PM
|
BLD00-02028
| BLD-Final | 1/11/2001 | 1/11/2001 | 1/11/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/11/2001 at 09:43:24. Contact: ###-####. Cert. of Compliance issued. 1/11/2001 4:19:13 PM
|
BLD00-03145
| BLD-Framing/Rough-in | 1/11/2001 | 1/11/2001 | 1/11/2001 12:00:00 AM | P | PASS |
|
|
SHEAR NAIL DWAYNE ###-####. C/N dated 1/11/01 items corrected, ok to side. 1/11/2001 2:20:34 PM
|
BLD01-00005
| BLD-Footing | 1/11/2001 | 1/11/2001 | 1/11/2001 12:00:00 AM | P | CANC |
|
|
Jared ###-#### Cancelled by contractor, not ready 1/11/2001 3:11:07 PM
|
BLD00-03532
| BLD-Framing/Rough-in | 1/11/2001 | 1/11/2001 | 1/11/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 01/11/2001 at 11:09:23. Contact: ###-####. no approved plans on site, reviewed basic procdeures of shear with framer, will call for reinspection. 1/11/2001 12:59:59 PM
|
BLD00-01647
| BLD-Framing/Rough-in | 1/10/2001 | 1/11/2001 | 1/11/2001 12:00:00 AM | P | FAIL |
|
|
###-####: Air seal package incomplete, need mechanical & electrical inspections. Prior c/n items completed regarding hd retrofit. 1/11/2001 3:04:40 PM
|