BLD01-02753
| BLD-Aging Inspection | 1/11/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | | NR |
|
|
comm'l roof, no call, exp 4-02 1/11/2002 9:40:57 AM
|
BLD00-03358
| BLD-Conference | 1/11/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 1/11/2002 9:30:09 AM w/ Bob of MK...new supt for McAlvaine; still need prior c/n's, eng's report, glazing info, etc.
|
BLD01-02724
| BLD-Other | 1/10/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 14:43:45. Contact: ###-####. grid...c/n, support offsets, add perim wires as need, chk at final. 1/11/2002 12:52:34 PM
|
BLD01-02507
| BLD-Framing/Rough-in | 1/10/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | A | FAIL |
|
|
mike ###-#### CELING GRID, c/n, seismic pods, spreaders, firestop at floor/ext wall 1/11/2002 5:13:35 PM
|
BLD01-02791
| BLD-Final | 1/10/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | P | NR |
|
|
fn mike ###-#### need complete fi 1/11/2002 3:18:48 PM nish items, clarify hvac 1/11/2002 3:19:03 PM
|
BLD01-03068
| BLD-Other | 1/11/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | P | PASS |
|
|
###-#### Hood; ok per plans, card to owner 1/11/2002 11:36:57 AM
|
BLD01-02724
| BLD-Framing/Rough-in | 1/11/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 1/11/2002 12:53:18 PM tunnel lids by corridor ok
|
BLD01-02607
| BLD-Conference | 1/11/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 1/11/2002 4:02:24 PM w/ bldr, resubmittal req'd for man door
|
BLD00-03538
| BLD-Framing/Rough-in | 1/11/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 340 On 1/11/2002 5:09:34 PM need manuf's attachment schedule for glazing walls at elevator lobbies
|
BLD00-01649
| BLD-Conference | 1/11/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 1/11/2002 5:17:15 PM w/Carl W. re 3rd fl shelled space, letter ok...no use at present.
|