BLD01-02379
| BLD-Foundation | 1/10/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 10:18:37. Contact: ###-####.
|
BLD01-01007
| BLD-Final | 1/10/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | A | PASS |
|
|
###-#### ok for perm 1/11/2002 9:32:40 AM
|
BLD00-02299
| BLD-Wall cover | 1/10/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 11:30:47. Contact: ###-####. ok to box around plum pipe 1/11/2002 9:40:22 AM
|
MEC01-03522
| Final | 1/11/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/11/2002 at 07:56:27. Contact: .
|
BLD01-00813
| BLD-Final | 1/11/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 408 On 1/11/2002 3:07:56 PM ok for perm
|
BLD01-00813
| BLD-Framing/Rough-in | 1/9/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | P | PASS |
|
|
###-####
|