Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02318 BLD-Framing/Rough-in1/10/20021/11/20021/11/2002 12:00:00 AMAPART
###-#### c/n posted on site--ok to insulate 1/11/2002 8:56:57 AM
BLD01-01815 BLD-Final1/10/20021/11/20021/11/2002 12:00:00 AMAPASS
###-#### lockbox 193 c. of c. #20976 issued. 1/11/2002 8:29:47 AM
BLD01-03173 BLD-Foundation1/10/20021/11/20021/11/2002 12:00:00 AMADONE
###-#### Already poured--appears ok 1/11/2002 10:40:32 AM
BLD01-02931 BLD-Framing/Rough-in1/10/20021/11/20021/11/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/10/2002 at 17:06:08. Contact: ###-####. c/n posted--ok to insulate 1/11/2002 9:32:48 AM
BLD01-02814 BLD-Foundation1/10/20021/11/20021/11/2002 12:00:00 AMAPART
###-#### wip--85% ready--Contractor provided eng. on footing as requested on approved plans by plan reviewer--pad was built per engineering, Lee Harrison (PE) was the engineer. 1/11/2002 9:49:58 AM
BLD01-02536 BLD-Foundation1/10/20021/11/20021/11/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 01/10/2002 at 12:24:36. Contact: . No approved plans on site--call for re-inspection. 1/11/2002 2:23:25 PM
MEC02-00038 Final1/11/20021/11/20021/11/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/11/2002 at 09:13:22. Contact: ###-####. 1/11/2002 1:40:35 PM
MEC02-00089 Final1/11/20021/11/20021/11/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/11/2002 at 09:14:21. Contact: ###-####. Gas fireplace 1/11/2002 1:10:57 PM
MEC02-00104 Pressure Test1/10/20021/11/20021/11/2002 12:00:00 AMPCANC
cancelled by contractor via telephone. 1/11/2002 2:09:33 PM
MEC02-00104 Final1/10/20021/11/20021/10/2002 12:00:00 AMPCANC
Disp set to [CANC] by a contractor via Hello! on 01/10/2002 at 18:33:33.