BLD01-02318
| BLD-Framing/Rough-in | 1/10/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | A | PART |
|
|
###-#### c/n posted on site--ok to insulate 1/11/2002 8:56:57 AM
|
BLD01-01815
| BLD-Final | 1/10/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | A | PASS |
|
|
###-#### lockbox 193 c. of c. #20976 issued. 1/11/2002 8:29:47 AM
|
BLD01-03173
| BLD-Foundation | 1/10/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | A | DONE |
|
|
###-#### Already poured--appears ok 1/11/2002 10:40:32 AM
|
BLD01-02931
| BLD-Framing/Rough-in | 1/10/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 17:06:08. Contact: ###-####. c/n posted--ok to insulate 1/11/2002 9:32:48 AM
|
BLD01-02814
| BLD-Foundation | 1/10/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | A | PART |
|
|
###-#### wip--85% ready--Contractor provided eng. on footing as requested on approved plans by plan reviewer--pad was built per engineering, Lee Harrison (PE) was the engineer. 1/11/2002 9:49:58 AM
|
BLD01-02536
| BLD-Foundation | 1/10/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 12:24:36. Contact: . No approved plans on site--call for re-inspection. 1/11/2002 2:23:25 PM
|
MEC02-00038
| Final | 1/11/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/11/2002 at 09:13:22. Contact: ###-####. 1/11/2002 1:40:35 PM
|
MEC02-00089
| Final | 1/11/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/11/2002 at 09:14:21. Contact: ###-####. Gas fireplace 1/11/2002 1:10:57 PM
|
MEC02-00104
| Pressure Test | 1/10/2002 | 1/11/2002 | 1/11/2002 12:00:00 AM | P | CANC |
|
|
cancelled by contractor via telephone. 1/11/2002 2:09:33 PM
|
MEC02-00104
| Final | 1/10/2002 | 1/11/2002 | 1/10/2002 12:00:00 AM | P | CANC |
|
|
Disp set to [CANC] by a contractor via Hello! on 01/10/2002 at 18:33:33.
|