Inspections for the day of: Friday, January 11, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02755 BLD-Aging Inspection1/11/20021/11/20021/11/2002 12:00:00 AM DONE
havent started work dug hole and stopped 1/11/2002 1:24:35 PM
BLD01-03059 BLD-Framing/Rough-in1/9/20021/11/20021/11/2002 12:00:00 AMAPASS
###-#### ok to cover 1/11/2002 11:20:08 AM
BLD01-01882 BLD-Framing/Rough-in1/10/20021/11/20021/11/2002 12:00:00 AMADONE
Scheduled by a contractor via Hello! on 01/10/2002 at 08:04:56. Contact: ###-####.
BLD01-02393 BLD-Conference1/10/20021/11/20021/11/2002 12:00:00 AMAPART
Scheduled by Inspector: 407 On 1/10/2002 12:05:12 PM ok to cover everythig but for around fire place and area that will be affected by fixing stairs 1/11/2002 12:09:12 PM
BLD01-01781 BLD-Final1/10/20021/11/20021/11/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/10/2002 at 12:23:05. Contact: ###-####. c/n on site 1/11/2002 10:27:39 AM
BLD01-00856 BLD-Footing1/10/20021/11/20021/11/2002 12:00:00 AMAPASS
###-#### after 10am
BLD01-02786 BLD-Framing/Rough-in1/10/20021/11/20021/11/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/10/2002 at 20:00:16. Contact: ###-####.c/n on site ok to insulate 1/11/2002 10:38:48 AM
MEC01-03817 Pressure Test1/11/20021/11/20021/11/2002 12:00:00 AMPPASS
###-####
MEC01-03422 Final1/11/20021/11/20021/11/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/11/2002 at 08:39:30. Contact: ###-####.
BLD01-00617 BLD-Framing/Rough-in1/11/20021/11/20021/11/2002 12:00:00 AMPFAIL
###-#### didnt do a c/n to much all the truss supports not in all the 2ply truss not nailed no supprots under ends of beams and grider trusses hangers missing or not nailed beam straping need eng on inter shear wall draft stoppes in attic 1/11/2002 3:37:16 PM
MEC02-00107 Final1/11/20021/11/20021/11/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 01/11/2002 at 10:28:42. Contact: ###-####.
BLD01-03097 BLD-Framing/Rough-in1/11/20021/11/20021/11/2002 12:00:00 AMPPASS
Added by Inspector: 425 On 1/11/2002 12:40:07 PM shear nailing ok to cover ext