MEC04-02695
| Final | 1/10/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | A | FAIL |
|
|
still same corrections, talked to builder on job site, he is going to fix his self also need to run overflow drain down to pan under furnace 1/11/2005 11:08:06 AM
|
MEC05-00091
| Final | 1/10/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: xenon long
|
MEC05-00090
| Final | 1/10/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: xenon long
|
MEC04-03735
| Pressure Test | 1/10/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | A | PASS |
|
|
pressure test ok, left notice for a permit on gas equipment installed and inspection 1/11/2005 12:41:55 PM
|
MEC05-00100
| Final | 1/10/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: RaChelle Meister
|
MEC05-00101
| Final | 1/10/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: RaChelle Meister
|
MEC05-00103
| Final | 1/10/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: RaChelle Meister
|
MEC05-00106
| Final | 1/10/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: RaChelle Meister
|
MEC05-00107
| Final | 1/10/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: RaChelle Meister
|
MEC05-00109
| Final | 1/10/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: RaChelle Meister
|
MEC04-03174
| Final | 1/11/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/11/2005 at 6:30:46 AM. Contact: ###-####.
|
MEC04-03473
| Rough-in | 1/11/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | A | PART |
|
|
pressure test ok, 60 pound, no r/i on inside, as door locked 1/11/2005 11:27:40 AM
|
MEC04-03473
| Pressure Test | 1/11/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Matt Hansen 60lb test ok...done by 350 1/11/2005 2:18:22 PM
|
MEC05-00023
| Rough-in | 1/11/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | P | PASS |
|
|
Fireplace needs to be inspected at this time. Thank you!!; Phone #: ###-#### x111 Internet Inspection Request from: Veronica England
|
MEC05-00023
| Pressure Test | 1/11/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | P | PASS |
|
|
Fireplace needs to be inspected at this time. Thank you!!; Phone #: ###-#### x111 Internet Inspection Request from: Veronica England
|
MEC05-00050
| Rough-in | 1/11/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | P | PASS |
|
|
LAURA ZANE; Phone #: ###-#### Internet Inspection Request from: Mya Matheson
|
MEC04-03309
| Final | 1/11/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | P | PASS |
|
|
LAURA ZANE; Phone #: ###-#### Internet Inspection Request from: Mya Matheson
|
MEC05-00016
| Rough-in | 1/11/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | P | PASS |
|
|
LAURA ZANE; Phone #: ###-#### Internet Inspection Request from: Mya Matheson
|
MEC05-00115
| Conference | 1/11/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | P | PASS |
|
|
Laura Zane; Phone #: ###-#### Internet Inspection Request from: Mya Matheson
|
MEC05-00115
| Rough-in | 1/11/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | P | PASS |
|
|
Laura Zane; Phone #: ###-#### Internet Inspection Request from: Mya Matheson
|
MEC04-03310
| Final | 1/11/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | P | PASS |
|
|
Laura Zane; Phone #: ###-#### Internet Inspection Request from: Mya Matheson
|
MEC05-00108
| Final | 1/10/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | P | PASS |
|
|
Contact - Patrick Fleming; Phone #: ###-#### Internet Inspection Request from: PATRICK FLEMING
|
MEC05-00086
| Rough-in | 1/10/2005 | 1/11/2005 | 1/11/2005 12:00:00 AM | P | PASS |
|
|
Shaun; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|