PLM06-00083
| Final | 1/10/2006 | 1/11/2006 | 1/13/2006 3:47:16 PM | A | PASS |
|
|
for w/h- vivian-###-#### final ok
|
MEC05-00606
| Final | 1/11/2006 | 1/11/2006 | 1/11/2006 4:23:44 PM | P | PASS |
|
|
|
MEC05-01490
| Final | 1/11/2006 | 1/11/2006 | 1/11/2006 4:23:28 PM | P | PASS |
|
|
###-####
|
MEC06-00104
| Final | 1/11/2006 | 1/11/2006 | 1/11/2006 3:51:52 PM | P | PASS |
|
|
Homeowner Janet ###-####, a/c only, any issues please call Lynn at ###-####, thank you.; Phone #: ###-#### Internet Inspection Request from: Stephanie Smith final ok with overflow extended all the way outside
|
MEC06-00101
| Rough-in | 1/11/2006 | 1/11/2006 | 1/11/2006 2:59:01 PM | P | FAIL |
|
|
doyle; Phone #: ###-#### Internet Inspection Request from: Barbara Moore provide access to approved plans
|
MEC06-00107
| Pressure Test | 1/10/2006 | 1/11/2006 | 1/11/2006 2:45:14 PM | P | CANC |
|
|
kathy ###-####//request after 2pm
|
MEC05-02691
| Conference | 1/11/2006 | 1/11/2006 | 1/11/2006 2:45:00 PM | P | PASS |
|
|
please call to schedule time///james or home at ###-####; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa conference on condensate disposal, combustion air, water heaters, water softenor, cats, apprentiship, indirect waste receptors, return air, and stuff.
|
PLM05-03658
| Final | 1/10/2006 | 1/11/2006 | 1/11/2006 11:09:50 AM | A | PART |
|
|
install a hot and a cold water R.P. on the water lines to the washers and chemical system in the laundry, install an R.P. on the water line to the dishwasher, install a double check upstream of the filter behind the ice maker, set the rest of the equipment in the kitchen area.
|
MEC06-00035
| Rough-in | 1/10/2006 | 1/11/2006 | 1/11/2006 11:01:21 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/10/2006 at 10:14:05 AM. Contact: ###-####.
|
MEC06-00035
| Pressure Test | 1/10/2006 | 1/11/2006 | 1/11/2006 10:18:42 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/10/2006 at 10:14:15 AM. Contact: ###-####.
|
MEC06-00036
| Pressure Test | 1/10/2006 | 1/11/2006 | 1/11/2006 9:47:22 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/10/2006 at 10:14:51 AM. Contact: ###-####.
|
MEC06-00036
| Rough-in | 1/10/2006 | 1/11/2006 | 1/11/2006 9:47:10 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/10/2006 at 10:14:40 AM. Contact: ###-####.
|
PLM06-00091
| Water and/or Sewer | 1/11/2006 | 1/11/2006 | 1/11/2006 9:43:16 AM | P | CANC |
|
|
water line only ###-#### for all star plm Disp set to [CANC] by a contractor via Hello! on Jan 11 2006 9:43AM.
|
PLM06-00040
| Plumbing Rough-in | 1/10/2006 | 1/11/2006 | 1/11/2006 9:40:34 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Kim Alderson
|
MEC06-00037
| Pressure Test | 1/10/2006 | 1/11/2006 | 1/11/2006 9:40:18 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/10/2006 at 10:15:20 AM. Contact: ###-####.
|
MEC06-00037
| Rough-in | 1/10/2006 | 1/11/2006 | 1/11/2006 9:40:01 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/10/2006 at 10:15:10 AM. Contact: ###-####.
|
PLM05-03745
| Plumbing Rough-in | 1/10/2006 | 1/11/2006 | 1/11/2006 9:11:20 AM | A | PASS |
|
|
ri ok
|
PLM06-00057
| Water and/or Sewer | 1/11/2006 | 1/11/2006 | 1/11/2006 8:29:37 AM | A | PASS |
|
|
I have sent a email for a Mon 1/9/06 inspection. Dont see a final so I’ll send again. If it has been done and I’m not looking in the correct place sorry. Thank you Helen; Phone #: ###-#### Internet Inspection Request from: Scott Wickstrom sewer final ok
|
PLM06-00057
| Final | 1/11/2006 | 1/11/2006 | 1/11/2006 12:00:00 AM | P | PASS |
|
|
I have sent a email for a Mon 1/9/06 inspection. Dont see a final so I’ll send again. If it has been done and I’m not looking in the correct place sorry. Thank you Helen; Phone #: ###-#### Internet Inspection Request from: Scott Wickstrom
|