FIR05-00665
| INSP-Final Inspection | 1/11/2006 | 1/11/2006 | 1/11/2006 3:50:19 PM | P | FAIL |
|
|
carl harrison; Phone #: ###-#### No approved plans on site. No inspection performed.
|
FIR04-00684
| INSP-Sprinkler Rough-in/Hydro | 1/10/2006 | 1/11/2006 | 1/11/2006 3:19:14 PM | P | PASS |
|
|
Dry system trip test and forward flush passed.
|
FIR05-00104
| INSP-Alarm Testing | 1/11/2006 | 1/11/2006 | 1/11/2006 3:18:36 PM | A | DONE |
|
|
Dry system, fourth and third floors have passed. Matt is to change the programming for the dampers to only reset when the panel is reset and not on silence.
|
FIR05-00567
| INSP-Final Inspection | 1/10/2006 | 1/11/2006 | 1/11/2006 3:16:51 PM | A | FAIL |
|
|
Refrigerator under the griddle did not shut off. Fix and retest.
|
FIR05-00162
| INSP-Final Inspection | 1/11/2006 | 1/11/2006 | 1/11/2006 10:53:53 AM | P | PASS |
|
|
permit finaled
|
FIR05-00821
| INSP-Final Inspection | 1/11/2006 | 1/11/2006 | 1/11/2006 10:43:12 AM | P | PASS |
|
|
Permit finaled
|
FIR05-00159
| INSP-Sprinkler Rough-in/Hydro | 1/10/2006 | 1/11/2006 | 1/11/2006 9:56:17 AM | A | PASS |
|
|
The two south facing overbuilds are ok to cover.
|
BLD05-02634
| FIRE-Sprinkler Rough-in | 1/10/2006 | 1/11/2006 | 1/11/2006 9:24:51 AM | A | DONE |
|
|
Roughin has already been passed. Ceiling tile has been installed. This project is being phased. Phase one of the sprinklers are passed. Project can be finaled when the second phase is inspected.
|
BLD05-03051
| FIRE-Conference | 1/10/2006 | 1/11/2006 | 1/11/2006 8:27:58 AM | A | FAIL |
|
|
no access and left two messages on rahmats voice mail
|
FIR06-00001
| INSP-Final Inspection | 1/10/2006 | 1/11/2006 | 1/11/2006 8:13:46 AM | A | FAIL |
|
|
Can't final until the ceiling tile is installed. Piping is ok to cover
|