Inspections for the day of: Wednesday, January 11, 2006.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00665 INSP-Final Inspection1/11/20061/11/20061/11/2006 3:50:19 PMPFAIL
carl harrison; Phone #: ###-#### No approved plans on site. No inspection performed.
FIR04-00684 INSP-Sprinkler Rough-in/Hydro1/10/20061/11/20061/11/2006 3:19:14 PMPPASS
Dry system trip test and forward flush passed.
FIR05-00104 INSP-Alarm Testing1/11/20061/11/20061/11/2006 3:18:36 PMADONE
Dry system, fourth and third floors have passed. Matt is to change the programming for the dampers to only reset when the panel is reset and not on silence.
FIR05-00567 INSP-Final Inspection1/10/20061/11/20061/11/2006 3:16:51 PMAFAIL
Refrigerator under the griddle did not shut off. Fix and retest.
FIR05-00162 INSP-Final Inspection1/11/20061/11/20061/11/2006 10:53:53 AMPPASS
permit finaled
FIR05-00821 INSP-Final Inspection1/11/20061/11/20061/11/2006 10:43:12 AMPPASS
Permit finaled
FIR05-00159 INSP-Sprinkler Rough-in/Hydro1/10/20061/11/20061/11/2006 9:56:17 AMAPASS
The two south facing overbuilds are ok to cover.
BLD05-02634 FIRE-Sprinkler Rough-in1/10/20061/11/20061/11/2006 9:24:51 AMADONE
Roughin has already been passed. Ceiling tile has been installed. This project is being phased. Phase one of the sprinklers are passed. Project can be finaled when the second phase is inspected.
BLD05-03051 FIRE-Conference1/10/20061/11/20061/11/2006 8:27:58 AMAFAIL
no access and left two messages on rahmats voice mail
FIR06-00001 INSP-Final Inspection1/10/20061/11/20061/11/2006 8:13:46 AMAFAIL
Can't final until the ceiling tile is installed. Piping is ok to cover