FIR07-00449
| INSP-Sprinkler Rough-in | 1/11/2008 | 1/11/2008 | 1/11/2008 3:45:01 PM | P | PASS |
|
|
See the city approved plans for locations where the sprinkler piping can be covered. The areas looked at today included piping above the lay in ceiling tile on the east side of the building.
|
FIR07-00993
| INSP-Sprinkler Rough-in | 1/11/2008 | 1/11/2008 | 1/11/2008 3:26:56 PM | P | FAIL |
|
|
Upright protection has been added only at the locations where the combustibles are. The combustible do not meet the definition of nfpa 13 8.14.1.5 (1). Provide upright protection throughout the attic space and resubmit plans showing the additional heads.
|
FIR07-00519
| INSP-Final Inspection | 1/11/2008 | 1/11/2008 | 1/11/2008 3:24:06 PM | P | PASS |
|
|
Electrical permit was applied for and has been finaled. This permit can be finaled
|
FIR07-01029
| INSP-Sprinkler Rough-in/Hydro | 1/10/2008 | 1/11/2008 | 1/11/2008 12:50:59 PM | A | PASS |
|
|
Sprinkler piping is ok to cover
|
BLD07-02876
| FIRE-Final Inspection | 1/10/2008 | 1/11/2008 | 1/11/2008 10:45:46 AM | A | PASS |
|
|
Life safety passed.
|
FIR07-00579
| INSP-Sprinkler Rough-in | 1/10/2008 | 1/11/2008 | 1/11/2008 10:32:51 AM | A | PASS |
|
|
See the city approved plans for areas inspected
|
FIR07-00578
| INSP-Sprinkler Rough-in | 1/10/2008 | 1/11/2008 | 1/11/2008 10:07:30 AM | A | PASS |
|
|
See the city approved plans for piping locations that are ok to cover.
|