Inspections for the day of: Monday, January 11, 2010.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00614 Site Preparation1/11/20101/11/20101/11/2010 3:16:48 PM PASS
ESC09-00810 Site Preparation1/4/20101/11/20101/11/2010 2:16:15 PMAPASS
ESC09-00748 Site Preparation ESC1/11/20101/11/20101/11/2010 2:03:22 PM NR
ESC09-00544 Site Final1/11/20101/11/20101/11/2010 1:52:37 PMPFAIL
Verbal to RP:
Ease back the grade of the exit and add additional 2" or greater washed rock to bothe ends of the exit. Once complete contact for a re-inspection.
ESC09-00543 Site Final1/11/20101/11/20101/11/2010 1:34:25 PMPPASS
ESC09-00790 Site Preparation1/11/20101/11/20101/11/2010 1:09:08 PM PART
Will meet with RP on 1/13/10 am to go over project details.
ESC09-00792 Site Preparation1/11/20101/11/20101/11/2010 1:08:56 PM PART
Will meet with RP on 1/13/10 am to go over project details.
ESC09-00045 Site Final1/11/20101/11/20101/11/2010 1:05:02 PMPFAIL
Once vegitation is established, will pass the final. Will re-inspect on 3/15/10
ESC09-00511 Tracking Control1/8/20101/11/20101/11/2010 12:03:24 PMAFAIL
Verbal to RP:
Change the contact number with the city so can be contacted if any issues occur.

Clean up all tracing onto Whisper woood to the south. Will re-inspect on 11/13/10.
ESC09-00510 Tracking Control1/8/20101/11/20101/11/2010 12:03:14 PMAFAIL
Verbal to RP:
Change the contact number with the city so can be contacted if any issues occur.

Clean up all tracing onto Whisper woood to the south. Will re-inspect on 11/13/10.
ESC09-00509 Tracking Control1/8/20101/11/20101/11/2010 12:03:03 PMAFAIL
Verbal to RP:
Change the contact number with the city so can be contacted if any issues occur.

Clean up all tracing onto Whisper woood to the south. Will re-inspect on 11/13/10.
ESC09-00508 Tracking Control1/11/20101/11/20101/11/2010 12:02:52 PMACANC
ESC09-00508 Tracking Control1/8/20101/11/20101/11/2010 12:02:38 PMAFAIL
Verbal to RP:
Change the contact number with the city so can be contacted if any issues occur.

Clean up all tracing onto Whisper woood to the south. Will re-inspect on 11/13/10.
ESC09-00733 Tracking Control1/11/20101/11/20101/11/2010 9:00:59 AMAFAIL
Verbal to RP:
CLean up all tracking onto S. Orchard rd from project. Also maintain the construction exit by adding additional rock in areas where vechiles are driving off of the sides. Will re-inspect on 1/13/09am.
ESC09-00804 Site Preparation ESC1/11/20101/11/20101/11/2010 8:49:19 AM NR
ESC09-00791 BMP Violation1/7/20101/11/20101/11/2010 8:22:14 AMAPASS