MEC10-03691
| Rough-in | 1/10/2011 | 1/11/2011 | 1/11/2011 4:59:40 PM | P | PART |
|
|
aaron Phone #: ###-#### needs condensate piped to the washer box. return air plenum completed. return duct by furnace hung off the ground.
|
MEC10-04195
| Final | 1/11/2011 | 1/11/2011 | 1/11/2011 4:33:10 PM | P | PASS |
|
|
Please use south side basement door. Thanks Dix. Phone #: ###-#### >> Inspection requested via web by Don Headrick final ok
|
MEC10-03024
| Pressure Test | 1/11/2011 | 1/11/2011 | 1/11/2011 3:53:37 PM | P | PASS |
|
|
3:30 20# test ok
|
PLM11-00040
| Plumbing Rough-in | 1/11/2011 | 1/11/2011 | 1/11/2011 1:27:24 PM | P | PASS |
|
|
Randy Phone #: ###-#### ri ok
|
MEC11-00105
| Final | 1/11/2011 | 1/11/2011 | 1/11/2011 11:53:40 AM | P | PASS |
|
|
There is a ladder in the back of the building for roof access. Please call Eric with installation questions/issues @ ###-#### Phone #: ###-#### >> Inspection requested via web by Angie maguire
|
MEC10-03024
| Pressure Test | 1/10/2011 | 1/11/2011 | 1/11/2011 11:47:25 AM | A | FAIL |
|
|
mike Phone #: ###-#### bad gauge
|
MEC10-03640
| Pressure Test | 1/10/2011 | 1/11/2011 | 1/11/2011 11:43:32 AM | P | PASS |
|
|
Re-inspect gas line. Phone #: ###-#### >> Inspection requested via web by Brad Allison ri 20# test ok
|
PLM10-02617
| Water Heater Final | 1/11/2011 | 1/11/2011 | 1/11/2011 10:57:49 AM | A | PASS |
|
|
|
PLM10-02617
| Water Heater Final | 1/10/2011 | 1/11/2011 | 1/11/2011 10:19:22 AM | A | NH |
|
|
call me for info Phone #: ###-#### >> Inspection requested via web by JIM LITTLE no access left notice
|
PLM11-00039
| Plumbing Rough-in | 1/11/2011 | 1/11/2011 | 1/11/2011 10:09:13 AM | A | PASS |
|
|
mait downer Phone #: ###-#### >> Inspection requested via web by j mait downer jr ri ok
|
PLM10-02174
| Final | 1/10/2011 | 1/11/2011 | 1/11/2011 9:07:29 AM | A | NR |
|
|
Remodel final trim. Please call job foreman Perry 30 mins ahead to meet for access, ###-####. Thanks! Phone #: ###-#### >> Inspection requested via web by Chris Field needs a dcva on trhe shower steamer
|
MEC11-00040
| Final | 1/10/2011 | 1/11/2011 | 1/10/2011 2:02:15 PM | A | PASS |
|
|
9am final ok
|
PLM11-00016
| Final | 1/7/2011 | 1/11/2011 | 1/10/2011 8:48:47 AM | A | PASS |
|
|
Please call 30 min before arriving, thanks Phone #: ###-#### >> Inspection requested via web by Tom Soniville
|