Inspections for the day of: Wednesday, January 11, 2012.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS11-00234 MIS-Aging Inspection1/11/20121/11/20121/18/2012 4:50:43 PM DONE
BLD11-02578 BLD-Framing/Rough-in1/11/20121/11/20121/11/2012 3:08:09 PMPPASS
TIM Phone #: ###-####. Interior steel stud walls at sales floor area and restrooms. No grid or hardlids.
GCB11-00102 GCB-Courtesy1/11/20121/11/20121/11/2012 2:37:40 PMPDONE
Elliot @ ###-####Call to setup meeting. meeting at 2:30 pm. Went over plans and door hardware issues with contractor. Noted that new walls that were constructed were done prior to permit being issued and are completed and sheet rocked at this time. No other trades work are i n walls that require inspections. New walls are non load bearing walls.
BLD11-02786 BLD-Final1/10/20121/11/20121/11/2012 11:13:44 AMADONE
Brian Phone #: ###-####
BLD11-02786 DOC - Permit Finaled1/11/20121/11/20121/11/2012 11:13:35 AMPPASS
All work appeares to be done in accordance with local codes and ordinances.
MIS11-00230 MIS-Aging Inspection1/11/20121/11/20121/11/2012 10:00:16 AM PASS
MIS11-00230 DOC - Permit Finaled1/11/20121/11/20121/11/2012 10:00:07 AMPPASS
Permit has been issued.
BLD07-01591 BLD-Aging Inspection1/11/20121/11/20121/11/2012 9:58:54 AM PEND
BLD07-01589 BLD-Aging Inspection1/11/20121/11/20121/11/2012 9:58:34 AM PEND
GCB11-00102 GCB-Courtesy1/10/20121/11/20121/11/2012 9:57:50 AMAPASS
Elliot @ ###-####Call to setup meeting. Called elliot and set up meeting for 2:30pm.
GCB11-00092 GCB-Framing1/10/20121/11/20121/11/2012 9:55:10 AMAPASS
Scott @ ###-####. ok to insulate.
GCB11-00093 GCB-Fndatn/slab ins/fld vent1/10/20121/11/20121/11/2012 9:29:30 AMAPASS
Jeremy @ ###-####. INspected welded wire mesh and vapor barrier for interior slab on grade.