Inspections for the day of: Friday, January 11, 2013.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-02262 FIRE-Final Inspection1/11/20131/11/20131/14/2013 4:36:10 PMPPASS
Fire life safety passed.
FIR12-00674 INSP-Final Inspection1/8/20131/11/20131/11/2013 2:49:30 PMAPASS
Fire alarm work tested satisfactory. Permit finaled.
BLD12-03185 FIRE-Conference1/10/20131/11/20131/11/2013 2:48:08 PMADONE
On site conference with contractor regarding fire sprinkler and fire alarm system modifications that may be necessary due to the remodel work and change of use.
FIR07-00273 FIR-Aging Inspection1/11/20131/11/20131/11/2013 12:53:02 PM DEFR
BLD12-01742 FIRE-Final Inspection1/11/20131/11/20131/11/2013 12:33:52 PMAPASS
Fire life safety finaled.
FIR12-00527 INSP-Final Inspection1/10/20131/11/20131/11/2013 12:32:26 PMAPASS
Fire sprinkler work passed final inspection and walkthrough.
FIR12-00594 INSP-Final Inspection1/10/20131/11/20131/11/2013 12:30:49 PMAPASS
Fire alarm work passed acceptance testing. Building address correction related to the account at central station completed while on site.
BLD12-01929 FIRE-Final Inspection1/10/20131/11/20131/11/2013 12:27:43 PMAPASS
Correction items verified. Fire life safety completed satisfactory.
FIR12-00505 INSP-Final Inspection1/11/20131/11/20131/11/2013 12:26:24 PMAPASS
Fire alarm work passed final inspection.