Inspections for the day of: Friday, January 11, 2013.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS13-00006 ESC-Conference1/11/20131/11/20131/13/2013 12:00:00 AMPDONE
Complaint that work is being conducted on the retaining wall located at the back of the property. Concrete cutting occurring. Will send to BLD to review.
ESC13-00002 Site Preparation1/9/20131/11/20131/11/2013 7:49:48 PMAPART
Could not verify or reach the RP over area of distubance and vegitave buffer due to snow cover.
ESC12-00858 General Inspection1/11/20131/11/20131/11/2013 7:48:56 PM PASS
ESC12-00981 Site Preparation1/11/20131/11/20131/11/2013 7:48:42 PM NR
ESC12-01185 Site Preparation1/11/20131/11/20131/11/2013 7:48:33 PM NR
ESC12-00905 Aging Inspection1/11/20131/11/20131/11/2013 7:48:24 PM PASS
ESC12-00837 Aging Inspection1/11/20131/11/20131/11/2013 7:48:12 PM PASS
ESC12-00835 Aging Inspection1/11/20131/11/20131/11/2013 7:48:00 PM PASS
ESC12-00668 General Inspection1/11/20131/11/20131/11/2013 2:28:12 PM PASS
ESC12-00908 Aging Inspection1/11/20131/11/20131/11/2013 2:27:56 PM PASS
No activites in the exterior at this time.
ESC12-00937 General Inspection1/11/20131/11/20131/11/2013 2:27:27 PM PASS
ESC12-01183 Site Preparation1/11/20131/11/20131/11/2013 2:27:09 PM NR
Did not see any activities occur at this time. Could not reach the RP.
ESC11-00117 General Inspection1/11/20131/11/20131/11/2013 2:26:19 PM PASS
ESC12-00830 Aging Inspection1/11/20131/11/20131/11/2013 2:26:11 PM DONE
Permit finaled.
ESC12-00830 DOC - Permit Finaled1/11/20131/11/20131/11/2013 2:26:02 PMPPASS
ESC12-00783 General Inspection1/11/20131/11/20131/11/2013 2:25:43 PM PASS
ESC12-00978 Site Preparation1/11/20131/11/20131/11/2013 2:25:22 PM NR
Discussed with the RP over the plan alterations. He must calculate the sqaure footage of the access, construction road and construction parking alterations. Explained to him that due to the additional area of disturbance; additional fees may be required.