GCB15-00080
| FIRE-Final Inspection | 1/11/2016 | 1/11/2016 | 1/11/2016 2:05:47 PM | P | FAIL |
|
|
City approved drawings show an exit sign on the east exit, no exit sign was installed. Exit sign needs to be installed or documentation approved by the city allowing removal of exit light.
|
GCB15-00040
| FIRE-Final Inspection | 1/11/2016 | 1/11/2016 | 1/11/2016 1:44:17 PM | P | FAIL |
|
|
Northwest exit, building B on city approved drawing, needs to have exit sign/emergency lighting serviced, egress/exit did not stay illuminated when power was isolated. Thumburn deadbolt on same door will be changed to double key deadbolt and associated signage installed. Exit discharge landings for building A need to have emergency egress illumination installed. SIngle action door hardware needs to be installed on the west exit for building A as well as a double key deadbolt installed on east entrance with associated signage.
|
FIR15-00864
| INSP-Final Inspection | 1/11/2016 | 1/11/2016 | 1/11/2016 12:58:46 PM | P | PASS |
|
|
Final fire alarm inspection passed/complete.
|
BLD16-00006
| FIRE-Final Inspection | 1/7/2016 | 1/11/2016 | 1/11/2016 10:28:47 AM | A | PASS |
|
|
No fire sprinklers, no fire alarms. East exit door has both thumb-turn deadbolt as well as lockable paddle type single action door hardware, thumb-turn deadbolt removed from rear door at time of inspection, life fire safety passed/complete
|
FIR16-00004
| INSP-Final Inspection | 1/11/2016 | 1/11/2016 | 1/11/2016 9:37:14 AM | A | CANC |
|
|
Inspection request cancelled per conversation with Don Kartchner, Phone #: ###-####, inspection will be rescheduled for a later date.
|
FIR14-00719
| INSP-Final Inspection | 1/8/2016 | 1/11/2016 | 1/11/2016 9:18:58 AM | A | PASS |
|
|
Previously noted items corrected/repaired, final fire alarm inspection passed/complete.
|