Inspections for the day of: Monday, January 11, 2016.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-01184 Aging Inspection1/11/20161/11/20161/12/2016 2:39:13 PM PASS
WIP. Locust and Franklin Street are clean. Storm drain on corner has sediment mat installed. No violations observed. Approved.
ESC15-00336 General Inspection1/11/20161/11/20161/12/2016 10:26:09 AM FAIL
Loose dirt and trackout all over parking and access road through Cordillera #2. Trash and litter is also uncontained in the parking lot area.

DI bag installed in Cordillera #1 is full and needs to be replaced as it still receives drainage from phase 2.

Needs sweeping and trash clean ASAP. Sweep up trackout to bike lane on Five Mile.

ESC14-00662 General Inspection1/11/20161/11/20161/11/2016 4:07:10 PM CANC
ESC15-00145 Aging Inspection1/11/20161/11/20161/11/2016 3:52:59 PM CANC
ESC15-00141 Aging Inspection1/11/20161/11/20161/11/2016 3:51:07 PM PASS
No construction activity at site. No distured area. Project is stabilzed, ESC permit conditions satisfied.
ESC15-00141 DOC - Permit Finaled1/11/20161/11/20161/11/2016 3:49:57 PMPPASS
ESC15-00651 Aging Inspection1/11/20161/11/20161/11/2016 3:36:41 PM PASS
WIP. No corrections needed. Yard in process of landscaping/stabilization.
ESC14-00356 General Inspection1/11/20161/11/20161/11/2016 3:19:53 PM CANC
ESC15-00107 General Inspection1/11/20161/11/20161/11/2016 11:54:25 AM PASS
ESC15-00344 General Inspection1/11/20161/11/20161/11/2016 11:41:04 AM PASS
Project near completion. Sun Valley stage has temp. occupancy. Some trackout from bus lot is occruing. Adjacent projects by Ekberg Construction in industrial area also in progress. No corrections at this time.
ESC14-00878 Aging Inspection1/11/20161/11/20161/11/2016 11:34:58 AM PASS
Runway paving project complete and grading permit finaled. No trackout issues observed around airport perimeter. ESC permit finaled.
ESC14-00878 DOC - Permit Finaled1/11/20161/11/20161/11/2016 11:33:30 AMPPASS
ESC14-00941 General Inspection1/11/20161/11/20161/11/2016 11:32:49 AM PASS
ESC15-00033 General Inspection1/11/20161/11/20161/11/2016 11:32:31 AM PART
WIP on west side parking lot. Eastern portion and main building area complete and occupied by LM Honda.

Trackout occuring to Gratz from work area and employee parking. Not leaving auto park area, needs to be street swept this week. DI have sediment protection. No other issues.
ESC15-01640 Site Preparation1/8/20161/11/20161/11/2016 9:22:11 AMAPASS
Site is located behind D ; B. Call if you would like me to meet you there. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari

Low risk site, self contained with existing pavement. Approved for construction.
ESC16-00035 Site Preparation1/8/20161/11/20161/11/2016 8:48:27 AMAPASS
Project is in construction (sorry about that). I spoke with Andy about this project. Let me know prior to the inspection if you would like to meet me there. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari

BMPs were installed prior to construction. Private storm drains and MS4 on Park Blvd have inlet filter bags. Stockpile is stored in middle of paved parking lot with perimeter controls. Approved.