BLD17-03581
| BLD-Foundation | 1/10/2018 | 1/11/2018 | 1/11/2018 2:59:20 PM | P | NR |
|
|
Dane Phone #: ###-####. Cancelled per Dane.
|
BLD17-02822
| BLD-Final | 1/11/2018 | 1/11/2018 | 1/11/2018 2:04:24 PM | P | DONE |
|
|
Mikael Phone #: ###-####
|
BLD17-02822
| DOC - Permit Finaled | 1/11/2018 | 1/11/2018 | 1/11/2018 2:04:07 PM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD17-00553
| BLD-Framing/Rough-in | 1/11/2018 | 1/11/2018 | 1/11/2018 1:38:55 PM | P | PASS |
|
|
Thanks. Thought I had already had this done. Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD17-03734
| BLD-Energy code compliance | 1/10/2018 | 1/11/2018 | 1/11/2018 10:45:22 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Tom Wells Inspection cancelled from web by: Tom Wells
|
BLD17-02423
| BLD-Framing/Rough-in | 1/10/2018 | 1/11/2018 | 1/11/2018 10:06:28 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs. Strap beam to column connections. ok to insulate.
|
BLD17-02932
| BLD-Framing/Rough-in | 1/10/2018 | 1/11/2018 | 1/11/2018 9:44:46 AM | A | PASS |
|
|
Ed Phone #: ###-####. Shear walls ok.
|