ESC17-00316
| Site Final | 1/11/2018 | 1/11/2018 | 1/16/2018 8:14:19 AM | P | CANC |
|
|
|
ESC16-01561
| BMP Violation | 1/10/2018 | 1/11/2018 | 1/12/2018 12:03:35 PM | A | PASS |
|
|
Trash picked up throughout subdivision. No fencing or other changes observed. No discharges.
WIP on utiility trenching along Barber Valley Dr. Moving stockpiles around site. Trackout to BV drve will need sweep at end of operation.
|
ESC16-01253
| General Inspection | 1/11/2018 | 1/11/2018 | 1/12/2018 11:56:54 AM | | CANC |
|
|
rescheduled
|
ESC16-01714
| Aging Inspection | 1/11/2018 | 1/11/2018 | 1/12/2018 11:53:01 AM | | PASS |
|
|
Blvd townhome complete and landscaped. DI bags will be removed by BlackRock Joey as the development moves east. No violations observed in work areas. ESC permit conditions satisfied.
|
ESC17-00078
| General Inspection | 1/11/2018 | 1/11/2018 | 1/12/2018 10:49:58 AM | | PASS |
|
|
No activity. No runoff observed, no trackout. Site retains stormwater well and is below Warm Springs. Road have been prepped for paving, awaiting good weather conditions.
|
ESC17-00245
| General Inspection | 1/11/2018 | 1/11/2018 | 1/12/2018 10:48:52 AM | | PART |
|
|
No trackout to Warm Springs, silt fence installed below access drive retaining wall.
Correction request for next week: - pick up loose trash around site, especially wind blown tyvek.
|
ESC17-00193
| Aging Inspection | 1/11/2018 | 1/11/2018 | 1/11/2018 12:27:43 PM | | PASS |
|
|
project complete, all permits finaled. No ESC requests.
|
ESC17-00193
| DOC - Permit Finaled | 1/11/2018 | 1/11/2018 | 1/11/2018 12:27:20 PM | P | PASS |
|
|
|
ESC17-01560
| Site Final | 1/10/2018 | 1/11/2018 | 1/11/2018 12:18:34 PM | A | PASS |
|
|
Project is final all BMPs removed. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
|
ESC16-01108
| General Inspection | 1/11/2018 | 1/11/2018 | 1/11/2018 11:55:12 AM | | CANC |
|
|
rescheduled
|
ESC17-00310
| Site Final | 1/10/2018 | 1/11/2018 | 1/11/2018 11:46:13 AM | P | PASS |
|
|
Work complete, ESC permit conditions satisfied.
|
ESC17-01350
| General Inspection | 1/11/2018 | 1/11/2018 | 1/11/2018 11:38:35 AM | A | PASS |
|
|
WIP at Pine Grove Park. No discharges or trackout off site. Permit sign and SWPPP information is posted, MS4 on Shoup has sediment filter bag installed, rock construction entrance installed. Approved.
|
ESC17-00102
| General Inspection | 1/2/2018 | 1/11/2018 | 1/11/2018 11:30:51 AM | P | FAIL |
|
|
corrections not complete
- trash uncontained in many areas - muddy water all over interior parking lot due to multiple stockpiles and stagings areas not having perimeter control. Need to haul off dirt not being used. - lots of mud in gutter and sidewalk along Bird
Corrections: - pick up trash along the west perimeter of site, in particular the NW corner - make plan to consolidate stockpiles or designate a material staging and dropoff area - provide board walks for workers who park on Bird - clean out all DI bags on Bird once water drains
Note, no trackout or discharges to Overland or Hackamore
Working with Dave with Summit and Rhett with Granite on improving site
|
ESC17-00102
| BMP Violation | 1/9/2018 | 1/11/2018 | 1/11/2018 11:30:34 AM | A | FAIL |
|
|
corrections not complete
- trash uncontained in many areas - muddy water all over interior parking lot due to multiple stockpiles and stagings areas not having perimeter control. Need to haul off dirt not being used. - lots of mud in gutter and sidewalk along Bird
Corrections: - pick up trash along the west perimeter of site, in particular the NW corner - make plan to consolidate stockpiles or designate a material staging and dropoff area - provide board walks for workers who park on Bird - clean out all DI bags on Bird once water drains
Note, no trackout or discharges to Overland or Hackamore
Working with Dave with Summit and Rhett with Granite on improving site
|
ESC17-00904
| BMP Violation | 1/9/2018 | 1/11/2018 | 1/11/2018 11:30:18 AM | A | FAIL |
|
|
corrections not complete
- trash uncontained in many areas - muddy water all over interior parking lot due to multiple stockpiles and stagings areas not having perimeter control. Need to haul off dirt not being used. - lots of mud in gutter and sidewalk along Bird
Corrections: - pick up trash along the west perimeter of site, in particular the NW corner - make plan to consolidate stockpiles or designate a material staging and dropoff area - provide board walks for workers who park on Bird - clean out all DI bags on Bird once water drains
Note, no trackout or discharges to Overland or Hackamore
Working with Dave with Summit and Rhett with Granite on improving site
|
ESC17-01559
| General Inspection | 1/2/2018 | 1/11/2018 | 1/11/2018 10:50:10 AM | P | PART |
|
|
No trackout, contractor notified ESC division about the temporary stockpiling that is occuring.
RP stated plan is start in February once utility and permanent stormwater plans are finalized.
correction request: -install sign board to post ESC permit and SWPPP information, notify inspector to post permit. - install sediment protection on storm drain on Saturn just south of site entrance.
|
ESC16-01729
| Tracking Control | 1/8/2018 | 1/11/2018 | 1/11/2018 10:32:20 AM | P | PASS |
|
|
Trackout on Beverly has been cleaned up. Gate has been shut. No trackout Victory. WIP grading/compacting final building pad.
|
ESC17-00316
| Site Final | 1/11/2018 | 1/11/2018 | 1/11/2018 10:24:37 AM | P | NR |
|
|
Construction compete, site is paved and landscaped and has onsite stormwater retention. No loose materials or construction debris remaining. BLD permit has been finaled.
Correction request for RP left by phone: - remove temporary DI bag from MS4 drain on Victory and call back for site final.
|
ESC17-00027
| Tracking Control | 1/11/2018 | 1/11/2018 | 1/11/2018 10:11:05 AM | A | PASS |
|
|
Roger returned call 1/8 PM after correction, stated would install construction rock entrance and have workers park on street.
Follow up inspection.
corrections completed after first request: - sweeping on Sorenson - new rock construction entrance inside of paved site entrance
Site walk through: - site is basin shaped, retain most stormwater and is extremely muddy within site. - silt fence perimeter controls are in good condition - DI bag installed on MS4 on Victory and is filtering runoff - some minor trackout to Victory, very wet conditions. Roger states access has been restricted to the south entrance off Sorenson.
No muddy discharges to Cole, sheet flow on Sorenson flows back into site, no MS4 connection yet.
After conditions dry: - sweep surrounding roads - conduct maintenance on DI bag on Victory.
|
ESC17-00332
| Aging Inspection | 1/11/2018 | 1/11/2018 | 1/11/2018 7:57:09 AM | | DONE |
|
|
Project signed off by BLD inspector in May 2017
|
ESC17-00332
| DOC - Permit Finaled | 1/11/2018 | 1/11/2018 | 1/11/2018 7:56:45 AM | P | PASS |
|
|
|
ESC14-00206
| General Inspection | 1/11/2018 | 1/11/2018 | 1/11/2018 7:56:19 AM | | CANC |
|
|
|