BLD18-03899
| BLD-Final | 1/10/2019 | 1/11/2019 | 1/16/2019 9:59:04 AM | A | NR |
|
|
Curt Phone #: ###-#### Need driveway completed.
|
BLD18-03251
| BLD-Concrete | 1/9/2019 | 1/11/2019 | 1/11/2019 4:13:57 PM | P | PART |
|
|
Jimmie Phone #: ###-#### Interior slab OK pending MTI special inspection, tests and approvals.
|
BLD18-00847
| BLD-Conference | 1/11/2019 | 1/11/2019 | 1/11/2019 4:09:58 PM | P | DONE |
|
|
C/N.........Provide off street parking. Provide a weather proof exterior. Need 6" clearance from Mfg. wall to finished grade. Complete all final inspections prior to March 12th 2019, when permit will expire.
|
BLD18-00055
| BLD-Other | 1/11/2019 | 1/11/2019 | 1/11/2019 4:05:30 PM | P | DONE |
|
|
Check ground clearance from coach C/N....not allowed to park on un- improved surface located at setback along Five Mile Rd. Provide off street parking. Provide Min. 6" clearance from Mfg. walls, to finished grade per State Statute code sect. 44-2201 (2).
|
BLD18-04406
| BLD-Foundation | 1/10/2019 | 1/11/2019 | 1/11/2019 2:43:59 PM | P | PASS |
|
|
Mark Phone #: ###-####
|
BLD18-03484
| BLD-Footing | 1/11/2019 | 1/11/2019 | 1/11/2019 2:32:24 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
MIS18-00085
| DOC - Permit Finaled | 1/11/2019 | 1/11/2019 | 1/11/2019 2:31:12 PM | P | PASS |
|
|
|
BLD17-04134
| BLD-Ceiling Grid Inspection | 1/10/2019 | 1/11/2019 | 1/11/2019 1:02:27 PM | P | PASS |
|
|
Jake-pleae call 20 minutes prior to meet Phone #: ###-####
|
BLD18-02206
| BLD-Conference | 1/11/2019 | 1/11/2019 | 1/11/2019 1:02:02 PM | P | NR |
|
|
Tim Phone #: ###-#### Need all trade finals.
|
BLD18-02014
| BLD-Framing/Rough-in | 1/10/2019 | 1/11/2019 | 1/11/2019 12:05:27 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jeran Millett
|
BLD18-04490
| BLD-Framing/Rough-in | 1/9/2019 | 1/11/2019 | 1/11/2019 11:29:22 AM | A | PASS |
|
|
Call ahead 45 minutes // Jordan Phone #: ###-####
|
BLD17-02321
| BLD-Framing/Rough-in | 1/10/2019 | 1/11/2019 | 1/11/2019 10:53:11 AM | A | PART |
|
|
Brett Phone #: ###-#### Shear only........OK.
|
BLD18-03933
| BLD-Framing/Rough-in | 1/10/2019 | 1/11/2019 | 1/11/2019 9:51:54 AM | A | NR |
|
|
Alex Phone #: ###-#### Need all trade R/I approvals prior to calling frame insp.
|